Similar Projects
Repairs of Water Services and Mains: 2022-2025
Term Contract
Results
$2,900,000 est. value
San Jose, CA

Valve Inspection Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Santa Clara, CA

Cast Iron Sanitary Sewer Replacement Package V
Alteration
Results
$1,015,707 est. value
San Jose, CA

Elkins Way Main Replacement
Infrastructure
Results
$50,000 est. value
San Jose, CA 95121

Alviso Main Replacement
Infrastructure
Results
$2,379,875 est. value
San Jose, Santa Clara, CA 95054

Kelley Park Outfall - City Of San Jose
Infrastructure
Conception
$772,000 est. value
San Jose, CA 95112

Santa Clara Conduit Rehabilitation and Pacheco Sectionalizing Valve Replacement Project
Infrastructure, Alteration
Results
$7,000,000 to $9,000,000 est. value
San Jose, CA

SBWR Metering and Pressure Monitoring Improvements
Infrastructure
Bidding
$1,980,000 est. value
San Jose, CA

Central Service Yard - Water Main Replacement - City Of San Jose
Infrastructure
Conception
San Jose, CA 95112

Citywide Water Line Replacement
Infrastructure
Results
$5,853,200 est. value
Sunnyvale, CA

Purchase of Twenty Clow Fire Hydrants
Infrastructure
Results
Milpitas, CA

New Trunk Line - 308a08 - City Of Morgan Hill
Infrastructure
Conception
$30,300,000 est. value
Morgan Hill, CA

Calabazas Creek Rehabilitation Project
Infrastructure
Results
$14,892,700 est. value
Cupertino, CA 95014

Combination Pressure Reducing and Pressure Sustaining Valves
Term Contract
Results
Santa Clara, CA

Public Works General Engineering Contract for Pipe Facilities 2022-2024
Infrastructure
Bidding
$1,000,000 est. value
San Jose, CA

Last Updated 07/06/2022 09:03 AM
Project Title

Almaden Valley Pipeline Inspection and Rehabilitation Project

Physical Address View project details and contacts
City, State (County) San Jose, CA   (Santa Clara County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,000,000 to $6,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project scope includes the following: 1. Drain and remove water from Almaden Valley Pipeline as shown in the Drawings. 2. Perform internal pipeline repair work on Almaden Valley Pipeline as specified and as identified during the internal pipeline visual and electromagnetic inspection, including carbon fiber reinforcement of Prestressed Concrete Cylinder Pipe or Welded Steel Pipe. 3. Completely drain and remove all water from the Calero Pipeline from Bailey Line Valve to Calero Modulating Valve. 4. Provide logistical support (including removal of flanges and appurtenances for access and ventilation) for repairs and modificationsto the existing Acoustic Fiber Optic (AFO) monitoring system on the Calero Pipeline by the District and its third-party consultant. 5. Perform work on raw water transmission pipeline appurtenances at three (3) sites. See the Pipeline Maintenance Tables in the Drawings for the appurtenance work to be completed at each site. 6. Perform logistical support for the maintenance, temporary removal, and re-installation of Acoustic Fiber Optic (AFO) monitoring system for the Almaden Valley Pipeline by the District's third-partyconsultant. 7. Clear and grub as needed for access to perform the Work. 8. Provide environmental support and BMP management. 9. Prepare and coat all new in-vault and exposed pipeline andtunnel appurtenances and associated piping assembly components.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents