Similar Projects
Brandon Middle School Renovations
Renovation
Conception
Ortonville, MI 48462

Pontiac Middle School and High School Science Lab Upgrades
Renovation
Bidding
$300,000 est. value
Pontiac, MI

Football Goalpost Replacement 2022
Renovation
Bidding
$12,000 est. value
Walled Lake, MI

2020 Bond Issue
Post-Bid
Warren, MI 48089

East Lansing Public Schools Donley Phase II
Post-Bid
East Lansing, MI 48823

Coldwater High School Locker Room Renovations
Renovation
Results
Coldwater, MI 49036

Armstrong Middle School Cafeteria Remodel Project
Renovation
Results
Less than $193,000 est. value
Flint, MI 48506

Brother Rice High School - Locker Room & Academics Renovations - Phase 1B
Renovation - 19,550 SF
Construction
Bloomfield Hills, MI 48301

Ojibwe Charter School - High School Addition and Renovations
Renovation, Addition
Construction
$3,349,000 est. value
Brimley, MI 49715

Construction Manager - Construction Management Services for Harbor Springs Public Schools 2022 Bond Program
New Construction
Bidding
$42,000,000 est. value
Harbor Springs, MI

2020 Bond Bid Package No. 5A
Post-Bid
Novi, MI 48374

Saginaw ISD - Millet Learning Center Phase II
Results
Saginaw, MI 48601

Junior/Senior High School Athletic Restroom Building
New Construction
Bidding
$325,000 est. value
Escanaba, MI 49829

Muskegon High School - Secured Entry and Aux Gym Project
Renovation
Post-Bid
Muskegon, MI 49441

Scarlett Middle School Kitchen Improvements
Results
Ann Arbor, MI 48108

Reported 05/24/2022 12:00 AM
Project Title

Northwest High School Athletic Building Upgrades

Physical Address View project details and contacts
City, State (County) Jackson, MI 49201   (Jackson County)
Category(s) Education, Entertainment/Recreation
Sub-Category(s) Athletic Facility, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $175,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope of work is a new gable roof, wood trusses, plywood decking, steel roofing, steel siding, and select windows on the Northwest Athletics building located at Northwest High School. The scope of work includes demolition, structural and architectural.

Details

Middle/Senior High School, Renovation, Athletic Facility, Renovation.
Division 01 - General Requirements, Construction Facilities.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents