Similar Projects
Home2Suites and Hilton Garden Inn / Edwardsville
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Edwardsville, IL 62025

Smith Lake Drainage Improvements - City of Wood River
Infrastructure
Conception
$1,900,000 CJ est. value
Wood River, IL 62095

Installation of a Second Water Meeting from Bethalto Water to Moreland Road
Infrastructure
Design
$1,750,000 CJ est. value
Bethalto, IL 62010

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Road Improvements
Infrastructure
Post-Bid
Pontoon Beach, IL

Madison County Government Annex Probation Building Renovation
Renovation, Infrastructure, Alteration
Post-Bid
$2,000,000 to $3,000,000 est. value
Edwardsville, IL 62025

Chapman Street Improvements
Infrastructure
Results
Edwardsville, IL 62025

City Hall Parking Lot Improvements
Infrastructure
Results
Granite City, IL 62040

Starbucks / Collinsville
New Construction, Infrastructure - 2,226 SF
Construction
$400,000 CJ est. value
Collinsville, IL 62234

Starbucks / Collinsville
New Construction, Infrastructure - 2,226 SF
Construction
$400,000 CJ est. value
Collinsville, IL 62234

Chick-fil-A / Glen Carbon
New Construction, Infrastructure - 5,000 SF
Pending Verification
$1,000,000 CJ est. value
Glen Carbon, IL 62034

Chick-fil-A / Glen Carbon
New Construction, Infrastructure - 5,000 SF
Pending Verification
$1,000,000 CJ est. value
Glen Carbon, IL 62034

Water Meters / Wood River
Infrastructure
Conception
$853,058 CJ est. value
Wood River, IL 62095

2022 MFT Program, Material Proposal
Term Contract, Infrastructure
Post-Bid
Collinsville, IL

West Dunn Street Improvements
Infrastructure
Results
Edwardsville, IL 62025

Last Updated 03/14/2023 09:04 AM
Project Title

Resurfacing and ADA Upgrades on IL 159/Troy Road

Physical Address View project details and contacts
City, State (County) Maryville, IL 62062   (Madison County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $12,374,453 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

5.7 miles of resurfacing and ADA upgrades on IL 159 / Troy Road from Center Grove Road to West Country Lane. Fed. Proj. NHPP-W1H1(517) Region 5 District 8 Federal Project # NHPP-STPTUCN(600) County(s) Madison Key Route(s) FAP 600 FAU 8887 Marked Route(s) IL 159, TROY RD Section(s) (122,122-1,30)RS-4 State Job #(s) C-98-028-20 PPS #(s) 8-00698-0000 Project Labor Agreement Completion Date : 170 Working Days Questions not accepted as of January 10, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, December 30, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 064 - Resurfacing and ADA Upgrades on IL 159/Troy Road

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents