Similar Projects
Replace Roof, Windows, Blakeslee and Allsebrook Buildings, Rangely Campus
Alteration
Bidding
$250,000 est. value
Rangely, CO

Recreation Center Roofing Project
Alteration
Bidding
$150,000 est. value
Brighton, CO

Clerestory Panels Replacement - Standley Lake Library
Alteration
Post-Bid
Arvada, CO 80005

Installation of TPO Roofing System (or Equivalent)
Alteration
Post-Bid
Pueblo, CO 81001

AFB 2141 CC 2018 Hail Damage Repairs
Results
$3,800,000 to $4,300,000 est. value
Colorado Springs, CO

Replacement of Hail Damaged Roof at Mary Miller Theater Historic Structure
Results
Lafayette, CO 80026

Front Range Village
Renovation
Construction
$230,000 est. value
Fort Collins, CO 80525

Mesa County Noland Building Roof Replacement
Alteration
Bidding
$200,000 est. value
Grand Junction, CO 81501

Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for Design-Build/Design-Bid-Build Roofing Construction - Colorado and Wyoming
Renovation
Post-Bid
Less than $49,000,000 est. value

Roof Replacement Hangar B-2 / Heliqwest
Results
Less than $154,000 est. value
Broomfield, CO 80021

CTCF Infirmary Roof Replacement Project at the Colorado Territorial Correctional Facility (CTCF)
Alteration
Bidding
$450,000 est. value
Canon City, CO 81212

La Jara Roof Replacement Project
Alteration
Post-Bid
La Jara, CO 81140

Roof Repairs at the Bob Burger Rec Center
Results
Lafayette, CO 80026

Loveland Sand Shed Roof Replacement
Alteration
Post-Bid
CO

CTCF Infirmary Roof Replacement
Results
Less than $800,000 est. value
Colorado Springs, CO

Reported 06/16/2022 03:00 AM
Project Title

Roof Repairs and Replacement

Physical Address View project details and contacts
City, State (County) La Junta, CO 81050   (Otero County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Remove existing roof system down to wood decking 2. Plate fasten 1 layer of 3" iso insulation 3. Install second layer of insulation board/bringing r rating to R30 4. Fasten 1 layer of (1) hr fire rated dens deck 5. Replace all sheet metal and plumbing vent pipe jacks 6. Install 60mil white mule-hide TPO over entire roof area using Rhino bond mechanically fastened system. 7. Apply fully adhered 60 mil white TPO on all 3 ft high wall areas 8. Install counter flashing along parapet walls McBride Hall - Replace Entire Roof 1. Remove existing multi layered roof system and insulation boards down to concrete deck. 2. Install 1 layer of 3" insulation board at 328.6 sq 3. Install 1/8" taper system 4. Reroof using 60mil fully adhered white mule-hide TPO system on upper sections 5. Install metal cap flashing 6. Flash parapet walls using 60 mil TPO fully adhered 7. Flash curbs using 60 mil TPO fully adhered Wheeler Library/Learninq Commons - Replace Saw Tooth Section - Center Hall Areas 1. Remove existing multi layered roof system down to wood deck 2. Fasten 1 layer of (1) hr fire rated 3. Reroof using 60mil fully adhered white mule-hide TPO system 4. Install new metal edge detail on perimeter McDivitt Hall - Bat Prevention on South and East Walls 1. Spud back white quartz gravel down to smooth felt base on curbs on perimeter 2. Apply plastic cement and woven fiber membrane at all curbs and perimeter gravel stop metal fill pitch pans with rubberized filler - repair expansion wall

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents