Similar Projects
PBSO, District 6 - Chiller Replacement
Bidding
Lake Worth, FL 33467

WUD, WTP 3 - Exhaust Fans Replacement
Term Contract
Bidding
Delray Beach, FL 33446

Cooling Tower Replacement
Post-Bid
Less than $2,700,000 est. value
Boca Raton, FL 33431

PBSO Real Time Crime Lab - HVAC Upgrades
Term Contract
Post-Bid
West Palm Beach, FL 33406

PBSO District 3 - HVAC Replacement
Term Contract
Results
West Palm Beach, FL

2019 Commercial Pool Cooler
Results
North Palm Beach, FL 33408

Library Gruber Sandbox Building LY - 3
Post-Bid
Boca Raton, FL 33431

GCC - Air Handler Unit #11 Replacement
Term Contract
Results
West Palm Beach, FL 33401

Pahokee Housing Authority Padgett Island / Fremd Village HVAC Project
Post-Bid
Pahokee, FL 33476

MCCH - HVAC Replacement AHU #27
Term Contract
Results
West Palm Beach, FL 33401

Building 12 Animal Lab Renovation
Post-Bid
Boca Raton, FL 33431

MCCH - HVAC Replacement AHU #28
Term Contract
Results
West Palm Beach, FL 33401

Commercial Pool Cooler System
Post-Bid
North Palm Beach, FL 33408

Governmental Center (GCC), HVAC Replacement AHU 6N
Term Contract
Results
West Palm Beach, FL 33401

HVAC and Air Duct Replacement and Installation
Term Contract
Post-Bid
West Palm Beach, FL 33415

Last Updated 11/07/2019 07:36 AM
Project Title

Hagen Ranch Road Library - Chiller Replacement

Physical Address View project details and contacts
City, State (County) Delray Beach, FL 33446   (Palm Beach County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of 125 Ton Air Cooled Chiller at the Hagen Ranch Library. Remove existing Trane 125 Ton Chiller, furnish and install a new HVAC chiller per the specifications and information provided in Exhibit 1 or approved equal. The contractor will also include the RTAF extended 6-10 year warranty or approved equal. The Work consists of the demolition and replacement of the chiller and system equipment required to provide a completely functional system. This includes items such as insulation, water treatment, flushing, electrical modifications and reconnection to the electrical existing electrical system in support of mechanical equipment replacement. Modification of the pad and supports as required to accommodate the new chiller and system components. The reconnection to the existing chilled water system and a functionality test is required. Providing a temporary chiller for uninterrupted chilled water service for the facility is required.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents