Similar Projects
Rehabilitation of the 2,000,000 Gallon Legged High Tank
Renovation, Infrastructure
Bidding
$400,000 CJ est. value
Downers Grove, IL 60515

D7 Olney Maintenance Yard Liquid Asphalt Storage Tank
Infrastructure
Bidding
$70,000 CJ est. value
Olney, IL 62450

Construction of the Water Tower 2 Recoating
Renovation
Sub-Bidding
$200,000 CJ est. value
Machesney Park, IL 61115

Fuel Tank Removal and Replacement
Post-Bid
Waukegan, IL 60087

Underground Storage Tank Fill-In-Place
Post-Bid
IL

New Ground Water Storage Tank
New Construction, Demolition
Results
Loda, IL 60948

Southwest Tank Rehabilitation
Results
Belvidere, IL

Water Tower Resurfacing
Renovation
Bidding
$2,739,000 CJ est. value
Strawn, IL 61775

Power Washing of the Fairfield Way Ewst (2.0 mg)
Post-Bid
Montgomery, IL

Elevated Water Storage Tank
Results
Grayslake, IL

Demolish Water Tower
Infrastructure
Bidding
$100,000 CJ est. value
Quincy, IL 62301

C213--SOURCES SOUGHT: Underground Storage Tanks and Above Ground Storage Tanks Maintenance and Testing
Post-Bid
Danville, IL 61832

Briar Lane Elevated Water Storage Tank Maintenance and Repainting
Infrastructure
Results
Less than $564,800 est. value
Oak Forest, IL

Gallon Double Ellipse (Division Street) Exterior Overcoat, Mixer Installation, and Misc. Repairs
Post-Bid
Mundelein, IL 60060

Phase V System Improvements Elevated Water Storage Tank Contract "L"
Alteration
Results
Less than $1,050,000 est. value
IL

Last Updated 08/18/2022 03:03 PM
Project Title

W3 Water Line Between Primary Tanks And Aeration Tanks

Physical Address View project details and contacts
City, State (County) Gurnee, IL 60031   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $57,272 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work on this contract consists of excavating and removing approximately 125 feet of 4" ductile iron W3 piping between two fire hydrants located between the primary tanks and aeration tanks. Replace with new 4" ductile iron piping. Restore disturbed concrete sidewalk and steps.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents