Similar Projects
USAFA Fy22 Grease Laden Duct Cleaning Service
Term Contract
Bidding

Alderson Hall Process Cooling Water System - Mechanical Contractor Prequalification
Term Contract
Bidding
$395,500 est. value
Golden, CO 80401

HVAC Control System Upgrade for Arvada Library
Post-Bid
Arvada, CO 80002

HVAC Maintenance Services
Post-Bid
Arvada, Evergreen, Golden, Lakewood, Littleton, Wheat Ridge, CO

Replace Obsolete Control Lakes Library
Results
$225,000 est. value
Golden, CO 80401

Prequalify Mechanical Contractors - Campus Infrastructure, Cp6 Chiller
Results
Less than $1,372,000 est. value
Golden, CO

Infrastructure projects at the Southwest Memorial Hospital
Post-Bid
Cortez, CO 81321

Mechanical, Electrical & Plumbing Construction Services
Results
Golden, CO 80401

HVAC and Mechanical Products
Term Contract
Post-Bid

Replace HVAC and Lighting Systems
Results
Less than $554,000 est. value
Lakewood, CO 80215

Heat Exchanger
Post-Bid
Golden, CO

Annual Chiller Maintenance
Term Contract
Results
Lakewood, CO 80232

Community Recreation Center HVAC Upgrade
Post-Bid
Arvada, CO 80003

Mechanical and Electrical Upgrades at 3 Troop Offices
Results
Less than $62,000 est. value
Lakewood, CO

CU Denver PN20-112394 - SCPP Only
Alteration
Post-Bid
$125,000 est. value
Denver, CO 80204

Last Updated 10/01/2021 02:04 PM
Project Title

Remington Building (49RMB) Cooling Tower Replacement

Physical Address View project details and contacts
City, State (County) Lakewood, CO 80215   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To replace the cooling tower which has reached the end of its useful life at the Remington Building. The Work shall include the complete removal of the existing cooling tower and the installation of a new cooling tower system. a. Provide all labor, materials, equipment, and supervision to complete the Work, including required permitting, as well as any other requirements needed for a complete and operational cooling system, pursuant to the plans and specifications. b. Remove and properly dispose of the existing cooling tower. c. Install new cooling tower on the existing concrete pad. d. Provide all required electrical work, including electrical power service disconnects and reconnections. All electrical work provided by the Contractor must be done by a licensed electrician. e. Perform all necessary start up functions and inspections to place equipment in full operational mode including factory startup of the new cooling tower.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents