Similar Projects
Z--Construction Hazmat Response IDIQ
Results
Less than $35,000,000 est. value

Z--Construction Hazmat Response IDIQ
Results
Less than $35,000,000 est. value

United States Environmental Protection Agency's (EPA) Region 8 Contracting
Results
Less than $136,000,000 est. value

Homeless Camp Cleanup
Term Contract
Results
Grand Junction, CO 81501

Nationwide MARFORRES Hazardous and Nonhazardous Waste Disposal and Environmental Services
Results

Last Updated 03/13/2020 06:04 PM
Project Title

Greeley Fishing Pond Remedial Action Plan Implementation and Vegetative Soil

Physical Address View project details and contacts
City, State (County) Greeley, CO 80631   (Weld County)
Category(s) Environmental
Sub-Category(s) Hazardous Waste Disposal, Landfill
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of, in general, construction of a minimum two-feet thick soil cap, an 8-ounce per square yard non-woven geotextile warning barrier, dimensional lumber cedar fencing and an aggregate surface course access road at the Greeley Fishing Pond facility located near Greeley, Colorado. A ditch exists on the south side of the site near active overhead power lines. The poles supporting these power lines have been ballasted with concrete that may have black mastic on it containing ACM. In areas where ACM concrete is located throughout the site, contractor will have to selectively pick and remove this material. A Terracon CABI will visually inspect this material for the mastic. Mastic containing concrete will be disposed of offsite as potentially asbestos containing material (PACM) or used onsite to fill low points under the proposed cover construction area.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Environmental Assessment, Natural Environment Assessment, Hazardous Material Assessment, Subsurface Investigation, Site Remediation, Contaminated Site Material Removal, Water Remediation, Asbestos Remediation, Asbestos Abatement, Removal and Disposal of Asbestos Containing Materials.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.