Similar Projects
Water Main Replacement
Design
Elmwood Park, IL

Madden Repair and Replacement of 4 Buffalo Water Boxes and Associated lines
Infrastructure
Bidding
$39,500 est. value
Maywood, IL

Grand Avenue Water Main Improvements
Infrastructure
Bidding
$1,700,000 est. value
Northlake, IL 60164

Raw Water Intake Maintenance
Post-Bid
Winnetka, IL

Purchase of Potable Water Meters
Post-Bid
Schaumburg, IL

Berwyn Depot District Utility Improvements
Results
Less than $11,765,090 est. value
Berwyn, IL

Graymoor Force Main Lining
Results
Less than $832,000 est. value
Olympia Fields, IL

2022 Water Main Improvements - Joint Fee Strip Clinton Avenue to Kenilworth Avenue
Infrastructure
Bidding
$280,000 est. value
Berwyn, IL 60402

2021 Water System Improvements
Post-Bid
Arlington Heights, IL

Water Main Repair Clamps
Results
Buffalo Grove, IL

Administrative and Leisure Center Water Lines
Infrastructure
Bidding
$75,000 est. value
Des Plaines, IL 60018

FY21/22 Water Main Improvements
Post-Bid
Northbrook, IL

Albert Avenue Water Main Lining
Results
Morton Grove, IL

2022 Master Meter Testing
Infrastructure
Bidding
Oak Park, IL

Revise Domestic Water System - Division 01
Post-Bid
Chicago, IL 60612

Reported 06/28/2022 11:52 AM
Project Title

Dundee Road: Greenview Road to Huehl Road - Water Main Replacement (Construction) - Village of Northbrook

Physical Address View project details and contacts
City, State (County) Northbrook, IL 60062   (Cook County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected January 2024
Bids Due View project details and contacts
Estimated Value $4,276,300
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Northbrook, Illinois. Conceptual plans call for site work for a water / sewer project. The water mains along Dundee Road between Greenview Road and Huehl Road are scheduled for replacement due to age, break history, and overall condition. Currently, this area has two 12-inch mains running parallel to each other in the parkway from Greenview Road to Pfingsten Road and a single 12-inch main running underneath the roadway from Pfingsten Road to Huehl Road. This project involves abandoning these mains and replacing them with a single larger diameter main running outside the roadway and connecting smaller segments of main and individual services to the new main. This work will be coordinated with the Illinois Department of Transportation. Staff anticipates engineering for this project will take place over a two-year period, concluding in FY 2024/2025, with construction in FY 2025/2026. This project is included in the city's 2023-2027 Capital Improvement Plan (CIP). As of June 27, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents