Similar Projects
Paran Road Multifamily Development
New Construction, Infrastructure
Conception
$8,300,000 CJ est. value
N Bennington, VT 05257

Paran Road Multifamily Development
New Construction, Infrastructure
Conception
$8,300,000 CJ est. value
N Bennington, VT 05257

Dorset Town Offices
New Construction, Infrastructure - 5,970 SF
Design
$3,600,000 CJ est. value
Dorset, VT 05251

Boorn Brook Farm Eco Resort
New Construction, Infrastructure
Design
$11,500,000 CJ est. value
Manchester Center, VT 05255

Shaftsbury Vtry(20)
Infrastructure
Bidding
$10,000,000 CJ est. value
Shaftsbury, VT 05262

Shaftsbury Vtry(20)
Infrastructure
Bidding
$10,000,000 CJ est. value
Shaftsbury, VT 05262

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ Engineering - Wastewater Projects
Infrastructure
Post-Bid
$210,000 CJ est. value
Arlington, VT 05250

Road Maintenance Green Mountains Vermont
Term Contract
Results
Montgomery, VT 05471

Service Line Replacement
Infrastructure
Results
$3,549,150 CJ est. value
Dorset, VT 05250

Manchester Elementary & Middle School Outdoor Classroom - Manchester Elementary Middle School
Infrastructure
Pending Verification
$50,000 CJ est. value
Manchester Center, VT 05255

Little Caesars / Bennington
Renovation, Infrastructure
Pending Verification
$300,000 CJ est. value
Bennington, VT 05201

BennHi Redevelopment
Demolition, New Construction, Infrastructure - 100,000 SF
Design
$10,000,000 CJ est. value
Bennington, VT 05201

Green Mountain National Forest Culvert Replacements Forest Roads 73 and 273
Infrastructure
Bidding
$1,000,000 CJ est. value
Bennington, VT 05201

East Dorset Pedestrian Improvements
Infrastructure
Post-Bid
$70,000 CJ est. value
East Dorset, VT 05253

Last Updated 08/21/2023 05:35 AM
Project Title

Arlington VTRY(25) & Manchester VTRY(26) & Shaftsbury VTRY(22)

Physical Address View project details and contacts
City, State (County) Arlington, VT 05250   (Bennington County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $2,852,082 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Arlington VTRY(25) : VTR Bridge No. 62 Over Warm Brook at Mile Post 14.72 in Arlington. Manchester VTRY(26) : VTR Bridge No. 67 Over Lye Brook at Mile Post 20.96 Shaftsbury VTRY(22) : VTR Bridge 58.5 - Over Paran Creek, Mile Post 3.45 Type of Construction: Arlington VTRY(25) (Re-ad) - Install Lateral Braces on the Top Flanges of Stringers. Install Cover Plates on Interior Floor Beams. Replace South Abutment Bearing Seat and Pedestals With Cast-in-place Concrete, and Clean and Reset Bearings. Manchester VTRY(26) (Re-ad) - Rehabilitate Superstructure With Web and Flange Plates, Replace Timber Pedestals With Cast-in-place Concrete Pedestals and Replace Bearing With Elastomeric Bearing Pads. Shaftsbury VTRY(22) (Re-ad) - Removal and Replacement of Existing Superstructure With Open Deck Steel Deck Plate Girder Structure, Remove and Replace Bridge Backwall and Bearings, Channel Work and Associated Track Work. Contract Completion Date: This Contract Shall Be Completed on or Before November 15, 2024. Electronic Bid Bond to Be Submitted in the Amount of 5% of the Contractor's Bid. Estimate is Category D : $1,000,000 - $2,500,000 During the Advertisement Period, All Questions Shall Be Addressed Solely to the Office of Contract Administration via Email: Aot.constructioncontractinginquiry@vermont.gov. All Inquiries Must Be Received by 4:30pm on Wednesday, June 28, 2023. Vtrans Hereby Notifies All Bidders That It Will Insure That in Any Contract Entered Into Pursuant to This Advertisement, Minority Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Sex, Or National Origin in Consideration for an Award. The Right is Reserved to Reject Any or All Bids, to Waive Any Formality, and Any and All Technicalities in Bids, and to Accept Such Bids as May Be Deemed in the Best Interest of the Awarding Agency *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. VTDOT - Arlington VTRY(25) & Manchester VTRY(26) & Shaftsbury VTRY(22) Question and Answer Addendum Date is expected July 5th , 2023 Project Overview a. Updates from previous bid Package o Added options to avoid the use of small quantities of rapid-set-concrete and improve availability where used. Precast pedestal option Repair and grout material options Working with suppliers to get mixes approved b. Shaftsbury VTRY (22) overview and highlights c. Arlington VTRY (25) overview and highlights d. Manchester VTRY (26) overview and highlights

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents