Similar Projects
Alyssum and Twinflower Storm Line Replacement - City of Forest Grove
Infrastructure
Conception
$300,000 CJ est. value
Forest Grove, OR 97116

Park Place Bridgeport Mixed Use
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
King City, OR 97224

Westbrooke Estates Mixed Use
New Construction, Infrastructure - 9,800 SF
Design
$55,000,000 CJ est. value
Hillsboro, OR 97123

OR8: SW Hocken Avenue - SW Short Street
Infrastructure
Design
$7,901,395 CJ est. value
Beaverton, OR 97005

North Transmission Line Intertie Project - CM/GC Contractor
Infrastructure
Bidding
$3,000,000 CJ est. value
Beaverton, OR 97005

SW Tualatin-Sherwood Road SW Langer Farms Pkwy to SW Teton Ave and Plm_4.2 - 66" Water Transmission Pipeline
Infrastructure
Post-Bid
$69,000,000 CJ est. value
Tualatin, OR 97062

SW Tualatin-Sherwood Road SW Langer Farms Pkwy to SW Teton Ave and Plm_4.2 - 66" Water Transmission Pipeline
Infrastructure
Post-Bid
$69,000,000 CJ est. value
Tualatin, OR 97062

Langer Drive Grind and Inlay Project
Infrastructure
Results
$480,000 to $520,000 est. value
Sherwood, OR 97140

Langer Drive Grind and Inlay Project
Infrastructure
Results
$480,000 to $520,000 est. value
Sherwood, OR 97140

Pacific Highway Street Lights - 95065 - City Of Tigard
Infrastructure
Construction
$718,423 CJ est. value
Tigard, OR 97223

Highway 99W Pedestrian Crossing Project - City of Sherwood
New Construction, Infrastructure
Pending Verification
$11,500,000 CJ est. value
Sherwood, OR 97140

Highway 99W Pedestrian Crossing Project - City of Sherwood
New Construction, Infrastructure
Pending Verification
$11,500,000 CJ est. value
Sherwood, OR 97140

Encompass Health Inpatient Rehabilitation Hospital / Hillboro
New Construction, Infrastructure
Conception
$36,000,000 CJ est. value
Hillsboro, OR 97124

North Dakota Street: Fanno Creek Bridge
New Construction, Infrastructure
Design
$3,326,890 CJ est. value
Tigard, OR 97223

Tigard Street (Fanno Creek) Bridge Replacement - City of Tigard
Demolition, New Construction, Infrastructure
Post-Bid
$3,050,000 CJ est. value
Tigard, OR 97223

Last Updated 09/30/2023 05:38 AM
Project Title

RFP - Tualatin River Greenway Trail Extension

Physical Address View project details and contacts
City, State (County) Tualatin, OR 97062   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $738,423 [brand] Estimate
Plans Available from Developer
Owner View project details and contacts
Architect View project details and contacts
Description

IDENTIFICATION OF PROJECT: Major items of work consist of the following: Concrete pathway, signing and striping, tree removal, stormwater facilities, manhole adjustments, landscaping, irrigation, reduced pressure backflow assembly, water main tap and other items as called for on the plans. The Contractor shall begin Work within 30 calendar days following the Notice to Proceed. Once the Contractor has commenced Work, the Contractor shall reach Substantial Completion of all work in this project by 180 calendar days, and Final Completion by 210 calendar days. Contractor shall reach Substantial Completion of the work in the easement at Roamers Rest RV Park by March 15, 2024. Proposals must be made upon the Proposal form bound in the Contract Documents and must be accompanied by a certified check or proposal bond payable to the City of Tualatin (County of Washington, State of Oregon) in an amount not less than ten percent (10%) of the total amount of the bid. RIGHT OF REJECTION: The City of Tualatin reserves the right to reject any bid not in compliance with all prescribed public procedures and requirements, and may reject for good cause any or all bids upon a finding that it is in the public interest to do so. Bids cannot be withdrawn within thirty days (30) after the Bid Closing. For additional information, contact Richard Contreras at (503) 691-3080 The First-Tier Subcontractor Disclosure form will be received at the location given for the receipt of the bid until 4:00 pm (local time), September 20, 2023. Instructions for providing the First-Tier Subcontractor Disclosure and the required disclosure form are included in the Contract Documents. Estimated range is $1.0m to $1.4m

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents