Similar Projects
CPS Fire Suppression Systems Maintenance & Repair Services
Term Contract
Bidding
Chicago, IL

2021 Fire Alarm System, Boiler Upgrades and Freezer Replacement
Bidding
Loves Park, Machesney Park, IL 61115

Inspection, Maintenance, Testing, Recharging and Repairing of Carbon Dioxide and Dry Chemical Fire Extinguishers and Accessories System-Wide
Term Contract
Post-Bid
Chicago, IL

Fire Testing and Inspection
Post-Bid
Chicago Heights, IL

Pirie & Arthur Ashe ES Fire Alarm System Install
Results
Chicago, IL 60619

Carroll ES & Fort Dearborn ES Fire Alarm System Install
Results
Chicago, IL

2021 Sprinkler Replacement
Bidding
Riverside, IL 60546

Replace Fire Doors And Air Handler Units
Post-Bid
Less than $150,000 est. value
Ina, IL 62846

Fire Alarm System Installation - Avalon Park, Nino Heroes, Hoyne, Warren ES
Results
Chicago, IL 60617

Replace Fire Alarm and Lock Controls
Bidding
Less than $4,000,000 est. value
Mount Sterling, IL 62353

Mil-Capital 183 Fire Alarm & Suppression Sys Insp
Post-Bid
Springfield, IL

Fire Alarm System Maintenance And Testing
Term Contract
Results
Rockford, IL 61104

Fire Suppression Repair
Post-Bid
Less than $25,000 est. value
Belleville, IL 62225

FY20 Fire Protection Risk Management Surveys for Multiple Locations in IL and IN
Results
Chicago, Springfield, IL

DFS- Metro Security and Fire Alarms-SLB
Term Contract
Post-Bid
Belleville, IL 62226

Reported 08/25/2020 12:00 AM
Project Title

Repair Fire Systems & Install Heating

Physical Address View project details and contacts
City, State (County) IL 62225   (Saint Clair County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Repair Fire Systems & Install Heating: Replace an aging fire suppression system that requires continuous maintenance, especially in the winter months when the deteriorating pipe material fails. In addition to keeping the warehouse from freezing and causing the suppression system piping to burst, the warehouse houses cleaning equipment and HVAC chemicals that need to be kept above 40 degrees Fahrenheit, therefore we will be installing a heating system to keep it to that minimum temperature.

Details

Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents