Similar Projects
Five Mile Pond Park Phase 1 - City of Springfield
Infrastructure
Conception
$1,500,000 CJ est. value
Springfield, MA 01119

Breckwood Pond Dam - Repair - City of Springfield
Infrastructure
Conception
$1,500,000 CJ est. value
Springfield, MA 01109

Abatement of VAT - Springfield Public Day High School
Alteration
Post-Bid
$100,000 est. value
Springfield, MA 01151

Abatement of VAT - Warner Elementary School
Alteration
Post-Bid
$100,000 est. value
Springfield, MA 01129

Asbestos Abatement
Alteration
Results
Chicopee, MA

Asbestos Abatement on 2 Floors Phase II
Alteration
Results
$24,000 est. value
Ludlow, MA 01056

Loon Pond Phase 2 - City of Springfield
Infrastructure
Conception
$1,500,000 CJ est. value
Springfield, MA 01103

Abatement of Vat at Talmadge Elementary School
Alteration
Post-Bid
$50,000 est. value
Springfield, MA 01118

Agawam Public Library Asbestos Mold Abatement
Alteration
Results
Agawam, MA 01001

Sand for Winter Sanding for Department of Public Works
Term Contract
Post-Bid
$50,000 CJ est. value
Springfield, MA 01103

Building 27 Restroom Abatement
Alteration
Results
$16,365 est. value
Springfield, MA 01105

Snow Removal Services
Term Contract
Post-Bid
Springfield, MA 01103

Lead and Asbestos Abatement , Replacement of Windows, Minor Vinyl Siding
Alteration
Results
East Longmeadow, MA 01028

Building Demolition of 106 Pine Street
Demolition, Infrastructure
Post-Bid
$100,000 CJ est. value
Holyoke, MA 01040

Removal of Asbestos Containing Materials at all CHA Developments
Alteration
Results
$70,000 est. value
Chicopee, MA

Last Updated 03/03/2023 03:04 PM
Project Title

Bathtub Replacement

Physical Address View project details and contacts
City, State (County) East Longmeadow, MA 01028   (Hampden County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $20,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of modification to one bathroom. "Bathtub Replacement" The Project consists of: modifications to one (1) existing bathroom. The Work of the Contract consists of: o Repair and renovation of one (1) shared, existing, handicapped-accessible shower and bathing room in this multi-dwelling unit elderly housing complex. o Removal of existing tub, hand shower, and controls. o Removal and re-installation of existing grab bars. o Installation of new grab bars. o Installation of new tub o Installation of new wall finish materials o Selective demolition and removal of existing conditions as indicated and/or as required to complete the Work. o Any and all Work, whether or not indicated, occurring in parts of the building other than the scheduled unit which may be required to successfully complete the scheduled Work . o Cutting, patching, and touching up in connection with the Work. o Restoration to at the this Project's pre-condition of: o Any items damage or destroyed by encroaching upon areas outside of the Project Site. o Any of the Site's existing conditions not indicated for modification, but which may be damaged or destroyed by this Project's operations. o Performance Bond and Labor and Materials Payment Bond. o Work either shown on the Drawings or included in the specifications unless specifically indicated not to be done. o Work outside the Project Site as called for in the Contract Documents and as required for the performance of the Work. o Providing and restoring, where appropriate, all temporary facilities. o Indicated work. o Incidental work (whether-or-not indicated) which is required for completion of all indicated Work. B. Execution of Work: Work to be performed in timely and workmanlike fashion. Site must be cleaned up daily with access needed for overnight. C. Warranties/Guaranties: 1. Bathtub 2. Shower and tub fill controls 3. Wall Panels 4. Tile base

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents