Similar Projects
Wastewater Treatment Plant - Phase 4 (.90) MGD and Lift Station No. 7
New Construction
Bidding
TX

Park Vista at El Tesoro Lift Station Facilities
New Construction
Bidding
Houston, TX 77083

Storm Sewer Pump Station to Serve Mustang Ridge
Post-Bid
Alvin, TX 77511

Upgrade of Serene Hills Lift Station
Post-Bid
Austin, TX 73301

Contract 2 - Booster Pump Station Improvements
Results
Less than $1,646,502 est. value
Mart, TX 76664

Lift Stations No. 16, 17, 18, and 21 Improvements
Results
Clear Lake City, TX 77058

Highway 84 Corridor Wastewater System Improvements Phase 2 Contract A
Construction
Less than $8,102,100 est. value
McGregor, TX 76657

Lakeside Park Restroom Grinder Pump Station and Sanitary Sewer
New Construction, Infrastructure
Bidding
$50,000 est. value
Rowlett, TX

Water Supply Improvements - Waterline and Pump Station Improvements
Post-Bid
Less than $685,000 est. value
Ranger, TX 76470

Fuller and Far North Well Sites Improvements
Results
$3,600,000 est. value
Euless, TX 76039

Sun Country Pump Station and Hydropneumatic Tank
New Construction
Bidding
$4,700,000 est. value
Crowley, TX 76036

Davis Road Lift Station No. 1 and No. 2 Rehabilitation
Post-Bid
Less than $630,000 est. value
League City, TX 77573

Improvements to Vista Ridge Lift Station
Results
$4,831,155 est. value
Lewisville, TX 75057

Hillwood Lift Station
Infrastructure
Bidding
TX

Mackenzie Creek Section 2 Lift Station
Post-Bid
Conroe, TX 77301

Reported 08/06/2021 12:32 PM
Project Title

Village Creek Water Reclamation Facility South Flow Lift Station

Physical Address View project details and contacts
City, State (County) Fort Worth, TX   (Tarrant County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method
Project Status Construction Commenced July 2021
Bids Due View project details and contacts
Estimated Value $19,993,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

120 MGD Lift Station, Influent Diversion Structure, 90-inch sewer pipeline, 66-inch force main, 72-inch emergency bypass, flow meter vault, modifications to Box F1, G and Bar Screen Building No3, odor control system, modifications to Headworks Facility with an addition of one fine screen and coarse screen, associated utilities, as well as necessary electrical and instrumentation.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents