Similar Projects
Paving and Traffic Improvements
Post-Bid
$500,000 est. value
Houston, TX

Clay Road Reconstruction
Post-Bid
$2,600,000 est. value
Houston, TX 77282

Waterline to Serve Lift Station No. 3 and Spring ISD
Results
TX

Water, Sanitary Sewer, and Drainage Facilities for wayside Village Section 6 and Parker Road
Results
Houston, TX

East River Phase I
New Construction - 649,156 SF
Construction
Houston, TX 77020

Almeda & Orem RV Resort
New Construction - 4,448 SF
Construction
$3,700,000 est. value
Houston, TX 77045

Imperial Forest Section 5
Post-Bid
Houston, TX

Silver Springs West Richey Road Dedication, Section One
Results
Less than $1,009,711 est. value
Houston, TX 77040

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

SWSP - Segment B3
Results
Houston, TX 77002

Paver Project - University Park Building 11
Post-Bid
Houston, TX

FM 1960 - Intersection Improvements
Results
Less than $13,274,738 est. value
TX

Northwest Waterline Rehabilitation Phase 1 of 4
Alteration
Post-Bid
Jacinto City, TX

2020 Paving Improvements Project
Results
$344,000 est. value
Piney Point Village, TX 77063

Clearing and Grubbing for Black Oak Phase 2
Infrastructure
Post-Bid

Last Updated 08/24/2022 06:34 AM
Project Title

HPW - Wastewater Collection System Rehabilitation and Renewal

Physical Address View project details and contacts
City, State (County) Houston, TX 77002   (Harris County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $5,549,804 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Work of the contract includes sliplining or pipe bursting approximately 39,550 feet of sanitary sewer ranging from 6 to18-inches in diameter; rehabilitation by cured-in-place pipe method of 10,500 feet of sanitary sewer ranging in size from 8 to 48-inches in diameter; slurry boring of 600 feet of sanitary sewer ranging in size from 8 to 12-inches in diameter; cleaning and television inspection of 35,220 feet of gravity sanitary sewer and force mains; reconnecting 630 services; making 110 point repairs on gravity sanitary sewers and force mains ranging in size from 6 to 48-inches in diameter; 4,298 feet of additional sewer replacement beyond these point repairs; construction of approximately 44 new manholes; 750 vertical feet of manhole rehabilitation; 3,500 square yards of removal and replacement of up to 2 inch hot-mix asphaltic concrete; 1,195 square yards of removal and replacement of 8-inch concrete pavement and 11,000 feet of cut or removal of existing liners from the host pipe; and ancillary work to remove and restore surface features disturbed as a result of the work.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents