Similar Projects
Last Updated | 04/03/2021 12:10 AM |
Project Title | Lanquist Street and 4th Avenue Reconstruction |
Physical Address | View project details and contacts |
City, State (County) | Siren, WI 54872 (Burnett County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project work includes the following: Reconstruction of Lanquist Street between STH 35 and 4th Avenue (approximately 900 lineal feet) including: large diameter elliptical storm sewer, approximately 175 lineal feet of sanitary sewer, and sidewalk, HMA pavement and curb and gutter; Reconstruction of 4th Avenue between Lanquist Street and CTH B (approximately 700 lineal feet) including concrete sidewalk, HMA pavement, and curb and gutter; Installation of a storm water detention basin; and Sidewalks and crosswalks at additional locations within the Village. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |