Similar Projects
Milwaukie / El Puente Elementary Safe Routes to School Improvements - City of Milwaukie
Infrastructure
Conception
$5,196,000 est. value
Milwaukie, OR

Eckerd Avenue, 2nd Street and Lola Avenue Sewer and Water Line Replacement
Infrastructure
Bidding
$1,400,000 to $1,750,000 est. value
Molalla, OR

Meldrum Street Overlay
Infrastructure
Bidding
$300,000 est. value
Government Camp, OR 97028

I-205 Improvements 1A - Or43 To Or213 Section of the East Portland Freeway
Infrastructure
Post-Bid
$30,000,000 est. value
OR

Salmonberry Drive Paving Project
Infrastructure
Post-Bid
$200,000 est. value
Oregon City, OR 97045

Museum of the Oregon Territory Parking Lot Repair
Infrastructure
Results
$115,000 est. value
OR

SAFE SSMP FY21 Improvement Project
Infrastructure
Results
$3,056,000 to $3,565,000 est. value
Milwaukie, OR

Henrici Reservoir Rehabilitation Project
Infrastructure
Bidding
$500,000 est. value
Oregon City, OR 97045

Boeckman Road Corridor Project
Infrastructure
Post-Bid
$26,000,000 to $28,000,000 est. value
Wilsonville, OR 97070

OR211 Canby Marquam Highway Project on The Woodburn
Infrastructure
Results
$100,000 to $500,000 est. value
OR

OR99E: MP 20.35 - Southwest Berg Parkway (Canby) Section of the Pacific Highway East (Route No. OR99E) in Canby
Infrastructure
Bidding
$10,000,000 to $20,000,000 est. value
Canby, OR 97013

Pavement Management Program: 2022 Pavement Rehabilitation Projects
Infrastructure
Post-Bid
$5,250,000 est. value
Lake Oswego, OR

Stone Creek Golf Course Pond Restoration Project
Infrastructure
Results
$320,000 est. value
Oregon City, OR 97045

2022 Wastewater Rehabilitation Project
Infrastructure
Post-Bid
$750,000 to $1,000,000 est. value
Lake Oswego, OR

South End Road MP 3.8
Infrastructure
Results
$330,000 to $340,000 est. value
Oregon City, OR

Last Updated 07/01/2022 07:07 AM
Project Title

Skyline Partition Project

Physical Address View project details and contacts
City, State (County) West Linn, OR 97068   (Clackamas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $190,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of installing improvements for a 3-lot partition, including erosion control measures, private asphalt driveway, concrete sidewalks, and utilities.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents