Similar Projects
Construction of a New 7,100 Sq. Ft. Cultural Center
New Construction, Infrastructure - 7,100 SF
Design
$2,000,000 CJ est. value
Red Cliff, WI 54814

Concrete Pavement, HMA Pavement, Asphaltic Surface - STH 13
Infrastructure
Bidding
$6,000,000 CJ est. value
Washburn, WI 54891

Concrete Pavement, HMA Pavement, Asphaltic Surface - STH 13
Infrastructure
Bidding
$6,000,000 CJ est. value
Washburn, WI 54891

Road Gravel
Term Contract
Post-Bid
Washburn, WI 54891

Paving
Infrastructure
Post-Bid
$386,000 est. value
Namekagon, WI

CTH J Pavement Replacement
Infrastructure
Results
WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Office/Storage building - Red Cliff Health Clinic
New Construction, Infrastructure
Bidding
$800,000 CJ est. value
Bayfield, WI 54814

South Maple Hill Asphalt Overlay
Infrastructure
Post-Bid
$240,000 est. value
Washburn, WI 54891

S. 7th Avenue West Rehabilitation Project
Infrastructure
Bidding
$25,500 CJ est. value
Washburn, WI 54891

South Maple Hill Road Grubbing Project - 2022
Infrastructure
Post-Bid
$160,000 est. value
Washburn, WI 54891

Holman Lakeview Drive Stormwater Improvement Project
Infrastructure
Bidding
$400,000 CJ est. value
Washburn, WI 54891

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Post-Bid
$80,000 est. value

Crack Filling
Infrastructure
Post-Bid
$120,000 CJ est. value
Russell, WI 54814

Last Updated 07/18/2023 11:39 AM
Project Title

Boulevard Road and County Line Road Project

Physical Address View project details and contacts
City, State (County) Oulu, WI 54847   (Bayfield County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $136,669 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of blading and shaping shoulders and ditches, pulverizing and relaying the existing asphalt surface, spreading the pulverized material to full width, supplementing the pulverized surface with dense graded base (3/4"), and leaving the road in a drivable condition on the 0.9 mile stretch of Boulevard Rd and the 0.5 mile stretch of County Line Rd. All other items and incidental work necessary to complete the project scope as shown on the plans and specifications are included. Bid security in the amount of 5 percent of the bid must accompany each bid in accordance with the Instructions to Bidders. The Town of Oulu reserves the right to reject any or all bids, to waive technicalities, and to accept bids most advantageous to the Town of Oulu. All questions should be submitted in writing by email to: Scott Weyandt at scott@weyandtengineering.com by Thursday, July 6, 2023. Requests submitted after that time will not be considered. All inquiries must be directed to the person indicated in this section. The final addendum will be issued by Monday, July 10, 2023. Questions received after final addendum may not be answered. Oral statements may not be relied upon and will not be binding or legally effective.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents