Similar Projects
2020 Haynes Street Storm Sewer Improvements
Post-Bid
Less than $389,175 est. value
Fremont, OH

MACC Task Order: USAF Repair Storm Drain Facility 10262-10266 WPAFB, OH - Project #17-0053
Post-Bid
Wright Patterson Air Force Base, OH

Concrete Ditch Replacement & Wing Wall Backfill
Results
$25,000 to $100,000 est. value
Fredericktown, OH 43019

Sunset Drive Area – Utility Improvements
Results
$350,000 est. value
Bay Village, OH

Waterline/ Storm Drainage/Walking Path Project
Post-Bid
Less than $504,000 est. value
Lakeview, OH

Lehnert Farms/Bolton Field Stormwater Improvements. 6
Results
Columbus, OH 43215

Various Catch Basins
Post-Bid
Canton, OH 44702

Jennings and Old Denison Combined Sewer Cleaning 2019
Results
Less than $1,200,000 est. value
Cleveland, OH 44115

Rebuild Test Structure - Lima, OH
Post-Bid
$1,000,000 to $5,000,000 est. value
Lima, OH

Urban Runoff Capture and Otter Creek Restoration Project
Results
Less than $696,483 est. value
Oregon, OH 43616

Harry Sauner Storm Sewer Improvements
Post-Bid
Less than $210,000 est. value
Hillsboro, OH 45133

Lock 9 Park Utility Project
Results
Less than $581,247 est. value
Piqua, OH 45356

Sewer Modernization and Replacement Tunnel (Smart) Project
Post-Bid
Dayton, OH

C.I.P. Storm and Sanitary Sewer – Phase I
Results
Less than $1,590,715 est. value
Kenton, OH 43326

Surrey Place Storm Improvements
Post-Bid
Loveland, OH 45140

Last Updated 04/20/2020 01:41 PM
Project Title

Collett, Delphos, Woodward and West Grand Avenue Sewer Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Lima, OH 45801   (Allen County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,744,878
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes the rehabilitation of 2,570 linear feet of 78-inch diameter combined sewer using a combination of Spiral Wound Pipe Renewal (SPR) technology and spray-applied geopolymer lining. A new 8-inch parallel relief sewer will be placed in the project area along W. Grand Avenue to capture the laterals and will be reinstated into the existing combined sewer. Forty-one (41) laterals will be replaced to the W. Grand Avenue right of way and provided cleanouts. All other laterals will be reinstated following rehabilitation. Bends in the existing sewer, as indicated in the Drawings, and existing manholes will be treated with geopolymer lining, totaling 160 linear feet.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents