Similar Projects
Bear Exhibit Redevelopment Project - Bid Package #2
Term Contract
Bidding
Toledo, OH 43609

Lift Station Bypass Pumps
Infrastructure
Bidding
OH

Submersible Vertical Well Pump
Post-Bid
Dayton, OH

Panel Assemblies for KI Miami North Wells
Post-Bid
Dayton, OH

Secondary Pump Replacement Project
Results
Less than $427,000 est. value
Dayton, OH 45422

Cleaning and Redevelopment of Wells #3 and #8
Results
Less than $68,956 est. value
Xenia, OH 45385

Revitalization of Production Wells
Infrastructure
Bidding
Cincinnati, OH

Dpu/Iqa/Project Dry Basement
Post-Bid
Columbus, OH

Greenfield Levee Pump/Motor #2 Repair
Results
Bainbridge, Greenfield, OH 45612

Rough Vacuum Pumps for VF-6 and Building 301
Term Contract
Post-Bid
Cleveland, OH 44135

Mad River Wellfield - Well 3 Replacement
Results
Fairborn, OH 45324

Influent Screw Pump Installation
Infrastructure
Post-Bid
Chillicothe, OH

2020 Test Well Services
Results
Less than $490,000 est. value
Wapakoneta, OH

Bear Exhibit Redevelopment - Pump Station Installation
Infrastructure
Post-Bid
Toledo, OH 43609

PUB Water Treatment Plant Well Rehabilitation Project
Results
$597,200 est. value
Batavia, OH 45103

Last Updated 12/09/2021 08:22 AM
Project Title

Maintenance and Service of SBU Prevention Equipment

Physical Address View project details and contacts
City, State (County) Cincinnati, OH   (Clermont County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

These services may include but are not limited to the maintenance and service of sewage ejector pumps, indoor and outdoor sewage grinder pumps, various storm water pumps and flood-gate automatic backwater valve systems. This service shall also include an inspection of the entire water prevention system to include digital photos of the systems condition before and after the service call, inspection of all visible ·seals, gaskets and system alarm panels along with checking the pump or backwater valve for proper operation. The cleaning and removal of debris or grease that may be found in the pump basin along with the checking of proper float setting and operation for both the pump and the alarm. The contractor shall also be responsible for contacting the homeowner/resident to schedule the initial service call along with any that may require additional visits.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents