Similar Projects
Slate Valley Walking Trail
New Construction - 3,600 SF
Design
Less than $15,000 est. value
Poultney, VT 05764

Waterville Elementary School Parking Lot Resurfacing
Bidding
Waterville, VT 05492

2021 Sidewalk Improvements
Bidding
Springfield, VT

Slip Formed Concrete Curbing 2020
Post-Bid
Rutland, VT

STP CVRT(2) - Winooski River Bridge and Bike Path Construction
Post-Bid
Montpelier, VT

West Rutland Sidewalk Segments STP BP15(1)
Results
$500,000 to $1,000,000 est. value
West Rutland, VT 05777

Design and Construction of Foot Trail at Taconic Mountain Ramble State Park
Results
$25,000 est. value
Hubbardton, VT 05743

Allen Road Shared-Use Path
Bidding
South Burlington, VT 05403

IQ004 Indefinite Delivery / Indefinite Quantity Primary Contracts –Contractor On-Ramp
Post-Bid
Montpelier, VT 05633

Kocher Drive - STP Sidewalk (12) and STP BP18(014)
Results
$500,000 to $1,000,000 est. value
Bennington, VT 05201

St. Albans Town Educational Center Sidewalk and Curbing
Bidding
Saint Albans, VT 05478

Sidewalk to Missisquoi Valley Union High School Swanton STP BP19(5)
Post-Bid
Swanton, VT

East Montpelier STP BIKE (63)
Results
$500,000 to $1,000,000 est. value
East Montpelier, VT 05651

Lyndon Town School Sidewalks
Post-Bid
Lyndonville, VT 05851

Mt. Philo Summit Trail Reconstruction
Results
Charlotte, VT

Last Updated 04/14/2021 03:28 PM
Project Title

North Country Union High School Bus Loop

Physical Address View project details and contacts
City, State (County) Newport, VT 05855   (Orleans County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reconstruction of the bus loop driveway at the High School. The project also includes the installation of an underdrain system next to and within the bus loop, pavement markings, and bid alternates for the construction of a new accessible parking area with (2) parking spaces, the construction of concrete accessible sidewalk curb ramps and a driveway entrance, pavement markings and signs for the ADA spaces, and a new entrance gate.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents