Similar Projects
American Muscle Factory Gym
Renovation
Conception
$650,000 est. value
Greenwood, IN 46143

American Muscle Factory Gym
Renovation
Conception
$650,000 est. value
Greenwood, IN 46143

Harvest Trail at Westfield Subdivision
New Construction - 180,000 SF
Design
Westfield, IN 46074

Community and Education Center and Hilltop PK and Preschool
Renovation, Addition - 68,050 SF
Design
Less than $19,398,000 est. value
Indianapolis, IN 46200

Lebanon 2022 Projects
New Construction
Bidding
$500,000 est. value
Lebanon, IN

Education Service Center (ESC) Office Remodel
Renovation
Bidding
$70,000 est. value
Greenwood, IN 46143

Westfield Washington Schools-Early Childhood Center and Administration Building-Bid Package 1
- 57,698 SF
Post-Bid
Westfield, IN 46074

RFP- Construction Manager As Constructor
New Construction, Renovation, Addition, Demolition - 1,474,984 SF
Post-Bid
Less than $334,159,000 est. value
Indianapolis, IN 46240

2021 Tennis Court Rehabilitation
Results
Fort Wayne, IN 46814

Toboggan Run and Piping Refurbishing
Results
$150,000 est. value
Angola, IN 46703

Electric Works Broadway | District
New Construction - 700,000 SF
Construction
$286,000,000 est. value
Fort Wayne, IN 46802

Cardinal Ritter High School
Renovation, Addition - 3,675 SF
Construction
Indianapolis, IN 46222

Ninjazone New Athletics Facility
New Construction - 37,000 SF
Pending Verification
$4,000,000 to $5,000,000 est. value
Westfield, IN

Warsaw Community High School & Warsaw Area Career Center
New Construction
Pending Verification
$28,948,675 to $30,251,675 est. value
Warsaw, IN

Luxury Apartment Tower
New Construction - 275,000 SF
Conception
$10,000,000 CJ est. value
Indianapolis, IN 46204

Last Updated 04/27/2022 08:43 AM
Project Title

High School Buildings - Tennis Complex and Athletic Facilities

Physical Address View project details and contacts
City, State (County) Jeffersonville, New Washington, IN 47130   (Clark County)
Category(s) Education, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Middle/Senior High School, Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Estimated Value for Jeffersonville High School - $2,000,000.00 and New Washington Middle/high School - $1,500,000.00

Details

Middle/Senior High School, New Construction, Athletic Facility, New Construction, Park/Playground, New Construction.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Selective Clearing, Earth Moving, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents