Similar Projects
Elevator and Escalator Maintenance Services
Infrastructure
Design
est. value
Indianapolis, IN 46204

Lighting
Infrastructure, Renovation
Design
$262,000 CJ est. value
Lynnville, IN 47619

Traffic Signals Modernization
Infrastructure
Sub-Bidding
$1,980,484 CJ est. value
Fort Wayne, IN 46802

Access Control - US 31
Infrastructure
Sub-Bidding
$2,000,000 CJ est. value
Jeffersonville, IN 47130

RFQ - Carrigan Road Bridge Lighting
Infrastructure
Post-Bid
$200,000 CJ est. value
Noblesville, IN 46062

Plumbing, Mechanical, Electrical Work for the New Mt. Vernon Elementary School
Alteration
Post-Bid
Fortville, IN

EA000B Multi-Building - Lighting Replacement (Internally/Externally)
Alteration
Results
$75,500 est. value
Bloomington, IN

Indiana Harbor Backup Power System, Indiana Harbor Canal, Confined Disposal Facility
Term Contract
Results
$1,000,000 to $5,000,000 est. value
East Chicago, IN

Install Lighting - Us 31
Infrastructure
Sub-Bidding
$2,278,910 CJ est. value
Carmel, IN 46033

Solar Array Procurement and Installation at Griffith Lift Station
Alteration
Post-Bid
Griffith, IN 46319

On-Call Electrical Conduit Installation
Term Contract, Alteration
Results
Indianapolis, IN

Repair or Replace Lighting - I-74
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Greensburg, IN 47240

Transformer Equipment
Alteration
Post-Bid
Fort Wayne, IN

Hamilton Heights ES / MS / HS
Alteration
Results
$6,000,000 est. value
Arcadia, IN 46030

Dynamic Wireless Power Transfer Test Site - US 52
Infrastructure
Sub-Bidding
$10,554,000 CJ est. value
Lafayette, IN 47909

Last Updated 09/06/2023 10:21 AM
Project Title

Rehabilitate Runway 12-30 Lighting

Physical Address View project details and contacts
City, State (County) Gary, IN 46406   (Lake County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $1,638,785 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Any bid received after the designated time set will be returned unopened. A pre-bid conference for this project will not be held. All provisions of Buy American Preference 49 USC 50101; Foreign Trade Restriction 49 USC 50104, 49 CFR part 30; Davis Bacon 2 CFR 200 Appendix II(D), 29 CFR part 5; Disadvantaged Business Enterprise --49 CFR part 26; Debarment and Suspension 2 CFR part 180 (Subpart C), 2 CFR part 1200, DOT Order 4200.5; Lobbying Federal Employees - 31 USC 1352 - Byrd AntiLobbying Amendment, 2 CFR part 200, Appendix II(J) 49 CFR part 20, Appendix A; Procurement of Recovered Materials - 2 CFR 200.322, 40 CFR part 247 and Solid Waste Disposal Act; and are herewith incorporated by reference, the same as if all of the provisions were completely set out herein. NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY 1. The Offeror's or Bidder's attention is called to the "Equal Opportunity Clause" and the "Standard Federal Equal Employment Opportunity Construction Contract Specifications" set forth herein. 2. The goals and timetables for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows: Goals for minority participation for each trade: Lake County, IN 20.9% Goals for female participation for each trade: National 6.9% These goals are applicable to all of the Contractor's construction work (whether or not it is Federal or federally assisted) performed in the covered area. If the Contractor performs construction work in a geographical area located outside the covered area, it shall apply the goals established for such geographical area where the work is actually performed. With regard to this second area, the Contractor also is subject to the goals for both its federally involved and non-federally involved construction. The Contractor's compliance with the Executive Order and the regulations in 41 CFR part 60-4 shall be based on its implementation of the Equal Opportunity Clause, specific affirmative action obligations required by the specifications set forth in 41 CFR 60-4.3(a) and its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade, and the Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, the Executive Order and the regulations in 41 CFR Part 60 4. Compliance with the goals will be measured against the total work hours performed. 3. The Contractor shall provide written notification to the Director of the Office of Federal Contract Compliance Programs (OFCCP) within 10 working days of award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the name, address, and telephone number of the subcontractor; employer identification number of the subcontractor; estimated dollar amount of the subcontract; estimated starting and completion dates of the subcontract; and the geographic area in which the subcontract is to be performed. 4. As used in this notice and in the contract resulting from this solicitation, the "covered area" is Indiana, Lake County, Gary. The Gary/Chicago International Airport Authority, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C 2000d to 2000d-4) and the Regulations, hereby notifies all bidders or offerors that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprise will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. A certified check or bank draft payable to the Gary/Chicago International Airport Authority, or a satisfactory bid bond, executed by the Bidder and an approved surety company in an amount not less than five (5) percent of the bid, shall be submitted with each bid proposal. Contractors awarded a contract will be required to furnish acceptable surety bonds in the amount of 100% of the awarded contract price. Said performance and material and payment bond shall remain in effect for twelve (12) months. All questions regarding this project must be in writing at least three (3) days prior to the bid opening. Answers to written questions will be provided by addenda to all bidders. Written questions may be mailed, faxed or e-mailed to: Ken Ross, P.E. NGC Corp. 38 Hackney Road Ravenswood, WV 26164 E-mail: kross@ngc.aero All questions shall be delivered by e-mail. Questions by phone will not be accepted. The Engineer will provide responses via addenda.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents