Similar Projects
Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Design
Less than $75,000,000 est. value
Washington, DC

Poplar Island Cell 1C Inlet Repairs, Poplar Island, MD
Design
$1,000,000 to $5,000,000 est. value
MD

CRS-2L Emulsified Asphalt with Polymer and/or CRS-2 Emulsified Asphalt
Term Contract
Post-Bid
Easton, MD 21601

ESN Duct Bank Crossing
Post-Bid
Easton, MD 21601

Culvert Replacement - Station Road
Results
Newcomb, MD

Goldsborough Neck Road Improvements
Results
Easton, MD 21601

Interstate 295 Miscellaneous Roadway Improvements
Post-Bid
$3,900,000 est. value
Wilmington, DE 19801

Tanyard Branch and Papermill Branch Stream Restoration Construction
Results
Easton, MD 21601

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Mill and Resurface
Results
$2,500,001 to $5,000,000 est. value
MD

Crack Sealing at Various Locations
Results
$500,001 to $1,000,000 est. value

Permanent Patching of Asphalt Superpave at Various Locations
Results
$500,001 to $1,000,000 est. value

Microsurfacing and Fog Sealing at Various Locations
Results
$1,000,001 to $2,500,000 est. value

Chip Seal at Various Locations
Results
$1,000,001 to $2,500,000 est. value

Annual Street Resurfacing 2020
Results
Easton, MD 21601

Reported 04/03/2020 12:00 AM
Project Title

Mistletoe Hall Farm Subdivision and Infrastructure Project

Physical Address View project details and contacts
City, State (County) Easton, MD 21601   (Talbot County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $2,500,000 to $5,000,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work will consist of the following: a) Relocation and installation of new utilities (including water, sewer, electric, and fiber optic). b) Construction of new Mistletoe Drive, reconstruction and extension of Bryan Drive (approximately 0.75 miles in length combined); c) Construction of nine driveway entrances; d) Installation of roadside ditches and driveway culverts; e) Installation of culverts and headwalls for stream crossings; f) Pond regrading.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 26 - Electrical.
Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents