Similar Projects
Kenosia Well Field Groundwater Treatment System Phase 2 - City of Danbury
Renovation
Conception
$2,000,000 CJ est. value
Danbury, CT 06810

Elmere Treatment Plant (New) & Storage Tank - City of Meriden
New Construction, Infrastructure
Conception
$33,500,000 CJ est. value
Meriden, CT 06451

RFQ Engineering - Drinking Water System Improvements
Infrastructure
Bidding
$300,000 CJ est. value
New Britain, CT 06051

Simsbury WWTP Restoration of Primary Clarifers Project
Infrastructure
Bidding
$250,000 CJ est. value
Simsbury, CT 06070

East Hartford Water Pollution Control Facility Aeration, Do Control, and Scada Upgrades - Phase 3B
Renovation, Infrastructure
Post-Bid
$5,000,000 CJ est. value
East Hartford, CT 06108

RFP - Solar Project Consultation and Implementation Services
Term Contract
Post-Bid
Litchfield, CT 06759

Sludge Degritting System Improvements
Renovation
Results
$9,165,000 CJ est. value
Stamford, CT 06902

Primary Sedimentation Basin No. 1 - Scum Skimmer System Upgrade Project
Renovation
Results
$250,000 est. value
Cromwell, CT

Water Pollution Control Facility Service Building Replacement
Demolition, New Construction, Infrastructure
Construction
$4,000,000 CJ est. value
Waterbury, CT 06708

Killingly WPCA Building Improvement Project
Renovation
Pending Verification
$200,000 CJ est. value
Killingly, CT 06239

Professional Consulting, Engineering Services, Evaluation and Visualization
Term Contract
Pending Verification
Hartford, CT 06103

West Lake - New Sludge Collection System - City of Danbury
Renovation
Conception
$555,000 CJ est. value
Danbury, CT 06810

UV Disinfection Upgrades
Renovation
Bidding
$660,000 CJ est. value
South Windsor, CT 06074

Franklin Area Consolidation Conduits: South Hartford Conveyance and Storage Tunnel (SHCST), Contract No. 4
Infrastructure
Post-Bid
$83,977,000 CJ est. value
Hartford, CT 06103

Lake Gaillard Water Treatment Plant Clarifiers, Recycle Pump Station, and Concrete Restoration
Renovation
Results
$3,810,610 CJ est. value
North Branford, CT 06471

Last Updated 02/15/2024 07:06 PM
Project Title

HVAC and Electrical Improvements at the Lake Gaillard Water Treatment Plant

Physical Address View project details and contacts
City, State (County) North Branford, CT 06471   (New Haven County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes replacement of air handling units and associated return fans; installation of a new dehumidification air handling unit to replace the air handler serving the pipe gallery; installation of a new condensing hot water boiler plant; replacement of the chilled water pumps and exhaust fans; installation of a new HVAC control system to serve all HVAC equipment, and installation of a new cooling system for the control room. The work also includes lighting replacement throughout the WTP, replacement of variable air volume (VAV) boxes, drop ceiling system replacement, and decommissioning the existing Trombe Wall. Contractors submitting a bid for this project shall hold a current Prequalification Certificate in the category of "Electrical" from the State of Connecticut Department of Administrative Services (DAS). A copy of the Contractor's DAS Prequalification Certificate and Update (Bid) Statement must be submitted with the bid. Any contract or contract awarded under this invitation for bids are expected to be Federally funded in part or by a loan from the EPA and The FY2022 Consolidated Appropriations Act. Neither the Federal Government or State of Connecticut nor any of its departments, agencies, or employees is or will be a party to this invitation for bids or any resulting contract. This procurement will be subject to the requirements contained in subsections (h), (j) and (o) of Section 22a-482-4 of the RCSA. Contractor is required to meet all Federal requirement/conditions. This Contract will be required to meet Davis-Bacon prevailing wage requirements and Disadvantaged Business Enterprise Program requirements including the Six Good Faith Efforts and Minority and Women's Business Enterprise (MBE/WBE) subcontracting reporting, per EPA Community Grant funding requirements. This Contract will also be required to meet State prevailing wage rate requirements. The project is subject to the requirements of the "Use of American Iron and Steel" (AIS) provision of the Consolidated Appropriations Act (CAA) (H.R.3547), enacted as Public Law (P.L.) 113-76 on January 17, 2014. This provision requires iron and steel products used to be produced in the United States. The Bidders will meet at the Lake Gaillard Water Treatment Plant, 765 Foxon Road, North Branford, CT. For this Pre-Bid meeting, two forms of identification will be required for each person attending. All Bidders shall complete a Confidentiality Agreement prior to reviewing or purchasing Bid Documents and/or attending the Pre-Bid meeting. Each Bid must be submitted on the prescribed Bid Form and accompanied by Bid security as prescribed in the Instructions to Bidders, payable to the South-Central Connecticut Regional Water Authority in an amount not less than 5 percent of the Bid amount. The Successful Bidder will be required to furnish the additional Bond(s) prescribed in the Bidding Documents. In order to perform public work, the Bidder and Subcontractors prior to award of contract shall hold or obtain such licenses as required by Connecticut State Statutes, and federal and local Laws and Regulations. The attention of bidders is called to the requirements of non-discrimination in employment practices, conditions of employment, and minimum wage rates to be paid. The South-Central Connecticut Regional Water Authority will not knowingly conduct business with providers of goods or services that are known to discriminate. The South-Central Connecticut Regional Water Authority encourages responses to its purchasing needs from women-owned and minority-owned business enterprises. No Bidder may withdraw its Bid within 90 calendar days after the date set for the receipt thereof. In the event that the South-Central Connecticut Regional Water Authority requires more than 90 calendar days after the actual date of the receipt of Bids and the selected, qualified Bidder does not grant an extension of time, the Authority reserves the right to award the Contract to another qualified Bidder who does grant an extension of time to award. For information concerning the proposed Work, contact Cody Savoy of South-Central Connecticut Regional Water Authority at 203-401-2729 or Joseph Popielarczyk of Tighe & Bond at 413-572- 3280. The South-Central Connecticut Regional Water Authority reserves the right to reject any or all bids pursuant to Section 16 of Connecticut Special Act No. 77-98, as amended. MBE (3%), WBE (5%) Question Deadline 02/07/2024.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents