Similar Projects
Last Updated | 03/08/2021 10:47 AM |
Project Title | Laurel Avenue East End Improvements |
Physical Address | View project details and contacts |
City, State (County) | Highland Park, IL (Lake County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Landscaping, Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work consists of repairing/reconstructing the bluff slope located immediately east of the Laurel Avenue pavement. The existing cul-de-sac will be shifted to the west 17.5 feet to provide additional room to flatten the bluff slope. The contract calls for 27 units of Tree Removal (6 To 15 Units Diameter), 50 Units of Tree Removal (Over 15 Units Diameter), 250 Feet of Combination Concrete Curb and Gutter, Type b-6.18, 360 Cy Of Earth Excavation, 780 Sy of Hot-Mix Asphalt Surface Removal, 2 1/4", 40 Ft Of Storm Sewers, 12" Pvc Sdr 26, Hma Binder and Wma Surface Course, and 70 Ft of Steel Backed Timber Railing. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |