Similar Projects
Creek Knoll A and B Neighborhood Roadway Reconstruction
Bidding
Edina, MN

Eden Avenue and Brookside Avenue Improvements
New Construction
Bidding
Edina, MN 55435

Ground Thawing Services
Term Contract
Post-Bid
Less than $175,000 est. value
Minneapolis, MN

2021 Infrastructure Improvements
Post-Bid
$1,500,000 to $2,000,000 est. value
MN

Meter Station M228A, Interceptor 7015C, and L35 Repair
Renovation, Addition
Results
Brooklyn Park, Maple Grove, MN 55101

Ridgedale Drive Watermain Replacement
Results
Minnetonka, MN 55305

Ductile Iron Pipe
Term Contract
Post-Bid
Minneapolis, MN

Brookdale Park Neighborhood Reconstruction
Results
Less than $5,900,000 est. value
Brooklyn Park, MN 55444

Grandview South Area Street and Utility Improvements Improvement
Post-Bid
$9,000,000 to $10,000,000 est. value
Brooklyn Center, MN

2021 Street Reconstruction Project Grading, Base, Bituminous Surfacing, Concrete Curb and Gutter, Storm Sewer and Water Main
Results
Less than $4,600,000 est. value
Plymouth, MN

Phase 4 Street and Utility
Results
Minneapolis, MN

Opus Area Improvements Phase 2
Results
Minnetonka, MN

2021 Water Rehabilitation
Results
Less than $1,000,000 est. value
Brooklyn Park, MN

Groveland Bay Improvements
Results
Minneapolis, MN

2021 Dean Avenue Improvement
Results
$880,000 est. value
Champlin, MN 55316

Last Updated 04/21/2021 10:34 AM
Project Title

Ridgedale Drive Watermain Replacement

Physical Address View project details and contacts
City, State (County) Minnetonka, MN   (Hennepin County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be contracted includes but is not limited to the replacement of watermain, services, cross-connections and fire hydrants along Ridgedale Drive between Plymouth Road and Oakland Road. This includes installing approximately 4,100 LF of watermain by slip-lining, 1,500 LF of watermain by horizontal directional drill, 620 of watermain by open cut, 430 LF of watermain by pipe bursting, 12 fire hydrants, 21 gate valves, 15 butterfly valves, 10 watermain connections, 9 water main service replacements, traffic control, temporary sediment control, turf restoration, bituminous paving. Bid alternatives shall be included in the project bid.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents