Similar Projects
HVAC And Structural
Term Contract
Bidding
Carbondale, IL

Re-Bid Insulation Repair Services For Plumbing And Heating, Cooling, Ventilation Systems
Term Contract
Post-Bid
Springfield, IL 62701

HVAC and Mechanical Products
Term Contract
Post-Bid

Electrical Repair and/or Replacement
Alteration
Results

Wrestling And Kinesiology Renovation
Renovation
Results
Carbondale, IL

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

PAV HA 6th Floor Lab - RO System Upgrade BP-02 (GC)
Alteration
Results
Lexington, KY 40506

Weatherization (IHWAP) Program
Term Contract
Post-Bid

Replace Campus Waterline
Infrastructure
Results
Less than $1,500,000 est. value
Carbondale, IL 62901

Maintenance Repair And Construction Electrical
Term Contract, Alteration
Post-Bid
Carbondale, IL

Trico Schools HVAC Replacement
Alteration
Results
$800,000 est. value
Campbell Hill, IL 62916

Carbondale Head Start Access Road & Parking Lot
Renovation, Infrastructure
Post-Bid
$175,000 est. value
Carbondale, IL 62901

HVAC Equipment Replacement
Alteration
Results
$450,000 to $500,000 est. value
Carbondale, IL

Heating Hot Water Piping Replacement
Renovation, Alteration
Post-Bid
Carbondale, IL 62901

Demolish And Construct Buildings And Additions (Electrical)
New Construction, Addition, Infrastructure - 6,100 SF
Results
$100,000 est. value
Cairo, Harrisburg, Murphysboro, Pinckneyville, IL

Last Updated 04/26/2022 05:15 PM
Project Title

East Campus Chiller Replacement

Physical Address View project details and contacts
City, State (County) Carbondale, IL   (Jackson County)
Category(s) Education, Single Trades
Sub-Category(s) College/University, Electric, HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Brief Description: This project will remove the existing water-cooled absorption chillers (3) and replace with new water-cooled centrifugal chillers (3). Remove and replace associated piping, valves, accessories, controls, etc., and provide electrical upgrades. There is a 30% BEP goal for this procurement. Project Estimated at HVAC $2,000,000 and Electrical $500,000.

Details

College/University, Renovation.
Division 01 - General Requirements.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents