Similar Projects
Rob Jaggers Main Water Line
Design
$200,000 to $400,000 est. value
NM

Santa Clara Pueblo Water and Wastewater System Improvements - Upper West Housing
Infrastructure
Bidding
Santa Clara, NM

Advanced Metering Infrastructure (AMI) System
Infrastructure
Bidding
Rio Rancho, NM

Lift Station 1 Rehabilitation and New Force Main
Post-Bid
Rio Rancho, NM 87124

Construction of Water System Improvements - Phase II
Post-Bid
Red River, NM 87558

Advanced Metering Infrastructure
Results
Less than $963,817 est. value
Truth or Consequences, NM 87901

Chamberino Mutual Domestic Water Consumer and Sewer Association Water System Improvements Project
Results
Anthony, NM 88021

La Cueva MDWCA Water System Improvements Project
Infrastructure
Bidding
Santa Fe, NM

Water System Valve Replacement
Post-Bid
Roswell, NM 88201

2018 Colonias Water System Improvements
Results
$373,870 est. value
Lordsburg, NM 88045

Construction of Navajo Gallup Water Supply Project Reach 27.10
Post-Bid
Gallup, NM 87305

Hemlock Circle Waterline Replacement Phase II
Results
$430,000 est. value
Ruidoso, NM

Los Brazos Water System Improvements
Post-Bid
Less than $65,000 est. value
Tierra Amarilla, NM

Water System Improvements
Results
Less than $1,082,681 est. value
Tularosa, NM

Wastewater and Water System Improvements Project
Post-Bid
Cimarron, NM 87714

Last Updated 06/23/2021 02:24 PM
Project Title

City-Wide Water Utility Construction Repair

Physical Address View project details and contacts
City, State (County) Santa Fe, NM   (Santa Fe County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: 1. Installation of all specified water mains, valves, blow-offs, fire hydrants and service connections, etc.. 2. Earthwork, grading and compaction for the restoring the driving surface over disturbed areas. 3. Coordination with Public Service Company of New Mexico (PNM) as required 4. Coordination with the New Mexico Gas Company as required 5. Coordination with Century Link as required 6. Coordination with New Mexico NM811 and/or contracting with utility location providers as required. 7. Coordination with the City’s Water Division for periodic review of system installations. 8. Coordination with the City’s Water Division as required for water main shut-off. 9. Any other related work associated with this work, as drawn and specified in the WO. 10. Provide all required materials testing. 11. Provide 12 month Contractor’s warranty on installed water distribution systems/lines, parts and labor. 12. Provide Manufacturer’s warranties on miscellaneous parts and labor.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents