Similar Projects
King Street Distribution and Flex Buildings
New Construction - 600,350 SF
Design
Enfield, CT

Warehouse
New Construction - 10,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Bristol, CT

Salt Shed Foundation at Stanley Quarter Park
New Construction
Post-Bid
New Britain, CT

Doordash
Renovation - 6,080 SF
Post-Bid
Hartford, CT 06114

Maintenance Garage Renovations at Zbikowski Park
Renovation
Results
$234,500 est. value
Bristol, CT 06010

Garage Bay Modifications
Renovation
Results
South Windsor, CT 06074

New Warehouse
New Construction - 294,500 SF
Construction
$20,206,564 est. value
Plainville, CT

Noah Webster House
New Construction
Construction
$202,001 est. value
West Hartford, CT

150 Dividend Road Mixed Use
New Construction - 30,750 SF
Pending Verification
Rocky Hill, CT 06067

Mirabito
New Construction
Pending Verification
Marlborough, CT 06447

Warehouse
New Construction - 3,200 SF
Design
$500,000 to $1,000,000 CJ est. value
Bloomfield, CT

Prefabricated Storage Sheds for the Eli Terry and Philip R. Smith Elementary Schools
New Construction
Post-Bid
South Windsor, CT 06074

Installation of a Pre-Fabricated Building Fire Training Facility
Results
New Britain, CT 06051

Warehouse Addition
Addition - 2,880 SF
Construction
$100,000 est. value
Newington, CT

True Storage
New Construction - 97,366 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Bloomfield, CT 06002

Last Updated 08/02/2021 07:38 AM
Project Title

Furnish and Install Accessory Building

Physical Address View project details and contacts
City, State (County) Glastonbury, CT 06033   (Hartford County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Constructing a 24'x 30' accessory building. Installation to be at the MPD Firing Range at 130 Line Street, Glastonbury, CT. The intent is for the structure to be installed and ready for use by July 2021. The purpose of this specification is to secure a single contractor to perform site preparations, and construct the structure. There are two methods of providing the construction: pre-fabricated and site built.

Details

Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents