Similar Projects
Wealthy Street - Ethel Avenue to East City Limit - City of Grand Rapids
Infrastructure
Conception
$936,320 est. value
Grand Rapids, MI 49525

Fuller Avenue - Knapp Street to 3 Mile Road - City of Grand Rapids
Infrastructure
Conception
$316,763 est. value
Grand Rapids, MI 49525

MoTown Square Affordable Assisted Living
New Construction, Infrastructure
Design
$14,000,000 CJ est. value
Grand Rapids, MI 49507

Woods of Albright - Phase 2
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Grandville, MI 49418

GRCC ATC Piazza Stair and Ramp Addition
Infrastructure, Alteration
Post-Bid
Grand Rapids, MI 49503

Sidewalk Repair - 2022
Alteration
Post-Bid
Kentwood, MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Kent ISD Parking Lot 5 Sidewalk
Infrastructure
Results
Grand Rapids, MI 49525

PNC Bank Branch No. B605
Renovation
Construction
Kentwood, MI 49508

PNC Bank Branch No. B703 Cascade
Renovation
Construction
Grand Rapids, MI 49546

Breton Grove Apartments / Grand Rapids
New Construction, Infrastructure - 16,395 SF
Pending Verification
$5,000,000 CJ est. value
Grand Rapids, MI 49508

The Flats at Metro Health Village
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Wyoming, MI 49519

Ottawa Avenue _ Hastings Street to Newberry Street - City of Grand Rapids
Infrastructure
Conception
$400,000 est. value
Grand Rapids, MI 49503

Speedway #7535 Rebuild / Grand Rapids
Addition, Demolition, New Construction, Infrastructure - 5,600 SF
Design
$1,300,000 CJ est. value
Grand Rapids, MI 49505

Rockford Public Schools-Bp#9 Cannonsburg & Lakes Paving
Alteration
Post-Bid
Rockford, MI

Last Updated 03/24/2023 05:13 PM
Project Title

Johnson Park - DISC Golf Parking Improvements

Physical Address View project details and contacts
City, State (County) Grand Rapids, MI 49534   (Kent County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $431,999 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Kent County Purchasing Division is soliciting bids for Disc Golf parking lot upgrades at Johnson Park, located at 3999 Butterworth St SW, Walker, MI 49534. Funding is provided in part through a Federal Community Development Block Grant (CDBG) from the US Department of Housing and Urban Development (HUD). The project consists of removing an existing gravel parking lot, site clearing/striping, excavation and grading, construction of 75 space paved parking lot, site restoration and landscaping. Project must comply with City of Walker standards. Contractor required to obtain all necessary permits from the City. The allowable on-site construction period for this project is 30 consecutive days, with all project activity completed June 15, 2023. Dimensions, if furnished, are for general reference only and should be verified by Respondents. Kent County will evaluate, award and contract for the goods and services in this solicitation in an efficient and timely manner. The solicitation will be awarded to the responsible bidder whose bid, conforming with all the material terms and conditions of the solicitation, is the lowest price. In no event will notification of award be more than thirty (30) days from the date of vendor submission. A pre-submission conference will not be held for this solicitation. If additional information is needed, please utilize the Inquiries link posted with the Solicitation. Benjamin Pitchellis Inquiries No Bid Bond is required if a bid is less than $500,000. If the bid is withdrawn after the bid opening, the Respondent may be removed from the Bidder's list ("Vendor Registration") pursuant to Kent County Purchasing Central Purchasing and Open Market Procedures for Goods and Services section D.13 Failure to Perform Satisfactory. Each bid over $500,000 must be accompanied by a Bid Bond executed by the Respondent and payable to County of Kent for five percent (5%) of the total amount of the bid. Attorneys-in-fact who sign Bid Bonds or Payment Bonds and Performance Bonds must file a certified effective dated copy of their Power of Attorney. A certified check, bank draft, cashier's check, or negotiable U.S. Government bond (at par value) may be submitted In lieu of a Bid Bond. Personal checks are NOT acceptable. Each contract over $50,000 must be accompanied by a Performance Bond and a Payment Bond, each payable to the Owner (County of Kent) and each in the amount of 100 percent (100%) of the contract price with a corporate surety approved by the funding agency, for the faithful performance of the contract. Bidder agrees that all Work will be substantially complete on or before June 15th 2023, with final completion on or before June 30, 2023. Pre-Submission Conference No

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents