Similar Projects
Roof Coating System Contractor
Post-Bid
Normal, AL 35762

Replace Six Roofs on Residential Homes
Post-Bid
McIntosh, Mount Vernon, AL 36560

National Roofing Program, FY 18 Construction AL084
Results
$250,000 to $500,000 est. value
Birmingham, AL

DHR Building Roofing Project
Results
Dothan, AL

Fire Station #22 (Tapia) - Roofing
Post-Bid
Mobile, AL 36608

Community Corrections Building Roofing Project
Results
Less than $219,350 est. value
Dothan, AL

15th Street Greenway Sun Shade
Results
Less than $235,250 est. value
Birmingham, AL 35205

Talladega Waste and Water Treatment Plant Reroofing
Results
Talladega, AL

Reroofing of the Alabama Emergency Management Agency Building
Results
Clanton, AL 35046

Putnam Filter Plant Roof Replacement Project
Results
Birmingham, AL

Miscellaneous Roofing Projects for Sumter County Board of Education
Results
AL

Reroofing for Springville Elementary School
Results
Springville, AL 35146

Reroofing of Various Schools
Results
Talladega, AL 35161

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

Re-Roofing St Clair Head Start Pell City AL
Results
Less than $179,500 est. value
Pell City, AL

Last Updated 12/10/2020 12:05 PM
Project Title

Re-Roofing of the Phenix City Water Filtration Plant Building B

Physical Address View project details and contacts
City, State (County) Phenix City, AL 36867   (Russell County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $150,875
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The following is a description of the work: 1. The Project is a complete tear-off of the existing roof on Building B and installation of new roof insulation, new TPO single ply roof membrane, new roof flashing, new curbs for roof top vents, roof exhaust, new roof coating on the exposed concrete roof deck and related items. The roof area is approximately 5800 SF. The Contractor is notified that the water treatment plant uses a number of chemicals during the process of treating the water for the residents of Phenix City, Alabama and shall take all precautions necessary to not allow rain water or any other kind of debris into the water supply and chemical containment areas. 2. The City will direct the contractor where to locate the work staging area. 3. The City will occupy the building during the project.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents