Similar Projects
Utilities - US 77
Infrastructure
Conception
$1,250,000 CJ est. value
Noble, OK 73068

Technology Place Street Extension - TR0120 - City of Norman
Infrastructure
Conception
$550,000 CJ est. value
Norman, OK 73071

Grade, Drain and Surface - IS 35
Infrastructure
Design
$10,000,000 CJ est. value
Norman, OK 73069

Utilities - SH 9
Infrastructure
Design
$545,000 CJ est. value
Norman, OK 73071

District 2 Luther Road Bridge Repair (N Canadian River & Railroad Bridge)
Infrastructure
Bidding
$3,000,000 CJ est. value
Oklahoma City, OK 74857

Raising of Sanitary Sewer Manholes
Infrastructure
Bidding
$400,000 CJ est. value
Norman, OK 73069

RFQ - University of Oklahoma (OU) First - Year Housing - Demolition
Demolition, Infrastructure
Sub-Bidding
$3,000,000 CJ est. value
Norman, OK 73072

Horizontal Directional Drilling
Infrastructure
Post-Bid
Norman, OK

Wastewater Treatment Plant Improvements South Canadian Wastewater Treatment Plant
Renovation, Infrastructure
Post-Bid
$203,529,800 CJ est. value
Oklahoma City, OK 73170

Moore Animal Shelter - Bid Package #1
New Construction, Infrastructure - 47,629 SF
Results
$6,492,069 CJ est. value
Moore, OK 73160

FYE 2023 Sidewalk Concrete Projects
Infrastructure
Results
$444,173 CJ est. value
Norman, OK 73069

Summit Valley Interceptor - City of Norman
Infrastructure
Pending Verification
$284,600 CJ est. value
Norman, OK 73069

Phase III projects - 2021 Bond - Moore Public Schools
New Construction, Renovation, Infrastructure
Pending Verification
$338,700,000 CJ est. value
Moore, OK 73160

Effluent Truck Wash Facility - SA0015 - City of Norman
Infrastructure
Conception
$492,950 CJ est. value
Norman, OK 73069

Interchange - IS 35
Infrastructure
Design
$20,000,000 CJ est. value
Norman, OK 73069

Last Updated 01/27/2023 04:15 PM
Project Title

Blending of Wells 5, 6, and 52

Physical Address View project details and contacts
City, State (County) Norman, OK 73069   (Cleveland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $584,950 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project will blend water from wells 5, 6, and 52 with the City of Norman Water Treatment Plant by installing approximately 2,200 feet of 8-inch waterline from well 52 and converting an existing 12-inch waterline to a groundwater line to move water from well 5 and 52 in order to blend with well 6 at the Water Treatment Plant. Bidders are expected to inspect the site of the work and to inform themselves regarding all local conditions. Each bid must be submitted in a sealed envelope bearing on the outside the name of the bidder, his/her address, and the name of the project for which the bid is submitted. If sent by mail, the sealed envelope containing the bid must be enclosed in another envelope addressed as stated above. All blank spaces for bid prices must be filled in, in ink or typewritten, and in both words and figures. Bids received more than ninety-six (96) hours, excluding Saturdays, Sundays and holidays, before the time set for opening the bids, as well as bids received after the time set for receipt of bids, WILL NOT be considered and will be RETURNED UNOPENED. A cashier's check, a certified check, or a surety bond in the amount of five percent (5%) of the bid shall accompany the sealed proposal of each bidder. Deposits will be returned to the unsuccessful bidders. Each bid submitted is a legal offer and when accepted by the NUA, constitutes a FIRM AND BINDING CONTRACT. The OWNER reserves the right to REJECT ANY or ALL BIDS. The OWNER further reserves the unconditional right to cancel all or any portion of this project within sixty (60) days from the date of opening of bids, for any reason and at its sole discretion. The Norman Utilities Authority (NUA) is exempt from the payment of any sales or use taxes. Pursuant to Title 68 O.S., Section 1356 (10) and as allowed by Oklahoma Tax Commission Rules Part 27 Trust Authority 710:65-13-140, direct vendors to the NUA are also exempt from those taxes. A bidder and his subcontractors may exclude from their bid sales taxes on appropriate equipment, materials, and supplies incorporated into the project and purchased by the NUA through the bidder. The bidder and his subcontractors will coordinate such purchases with the NUA. Questions concerning the bid or project requirements should be directed to Meagan Brown, PE at Meagan.Brown@freese.com.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents