Similar Projects
Clarifier Collection Systems - 18R01 - North Shore Water Reclamation District
Demolition, Alteration
Conception
$3,799,400 est. value
Gurnee, IL

Canterbury Drive/Elm Ridge Drive/Wood Drive/Woodland Drive - Willow Creek Subdivision, Phase II - Village Of Northbrook
Alteration
Conception
$4,375,701 est. value
Northbrook, IL

RFQ Contractor - Terminal 5 Landside and Parking Improvements - Bid Package 8
Infrastructure
Design
$200,000 CJ est. value
Chicago, IL 60666

Locust Street CSO Elimination and Water Main Replacement - Phase 4+5 Construction - City of Bloomington
Infrastructure
Design
$2,190,000 est. value
Bloomington, IL 61701

Drainage Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Ogden, IL 61859

Water System Improvements Phase 2 - Watermain Replacement
Infrastructure
Bidding
$700,000 est. value
Blue Mound, IL

Concrete Replacement In Various Recreation Areas for Carlyle Lake
Post-Bid
$25,000 to $100,000 est. value
Carlyle, IL 62231

Water Main Installation Services
Post-Bid
Springfield, IL

Concrete Repairs
Results
Elgin, IL

McCormick Park Area Water Main Replacement
Results
Crystal Lake, IL 60014

Vetter Road Segment II Roadway Reconstruction & Realignment Drainage Improvements
Addition
Construction
Joliet, IL

Garden Hills Detention Basin Phases 4, 5 - City of Champaign
Infrastructure
Pending Verification
$96,800,000 CJ est. value
Champaign, IL 61820

Touhy Avenue Watermain Replacement - Village of Niles
Alteration
Conception
$4,000,000 est. value
Chicago, IL 60631

Schiller Park Detention Pond and Storm Sewer Installation Project, Schiller Park, Illinois
Infrastructure
Design
$1,000,000 CJ est. value
Schiller Park, IL 60176

Water System Improvements
Renovation, Infrastructure
Bidding
$300,000 est. value
Groveland, IL

Last Updated 08/01/2022 01:39 AM
Project Title

2022 Hydrant Replacements

Physical Address View project details and contacts
City, State (County) Mattoon, IL   (Coles County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Concrete, Water Lines
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $469,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes Fire Hydrant Installation, Line Stops, Water Main Taps, Fire Hydrant Removal, and Concrete Removal & Replacement. All Contracts for the Construction of Public Works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-12) and all Equal Employment Opportunity requirements. Certified payrolls are required weekly. The right is reserved to waive technicalities and to reject any or all proposals.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents