Similar Projects
Ayer Street Water Line- City of Barre
Infrastructure
Conception
$510,000 CJ est. value
Barre, VT 05641

Brook Street Water Line - City of Barre
Infrastructure
Conception
$240,000 CJ est. value
Barre, VT 05641

Berlin Mall New Mixed-Income Housing Development
New Construction, Infrastructure
Design
$5,750,000 est. value
Berlin, VT 05602

Copley Mansfield Orthopaedics Medical Office
New Construction, Infrastructure - 9,990 SF
Design
$5,800,000 CJ est. value
Waterbury, VT 05676

BGS - Central Services Envelope
Renovation, Infrastructure
Bidding
$170,000 CJ est. value
Middlesex, VT 05602

Marshfield-Danville NH PS19(1)
Infrastructure
Bidding
$25,000,000 CJ est. value
Marshfield, VT 05658

Camp Smith Universally Accessible Trail Phase 2
Infrastructure
Post-Bid
Waterbury, VT

Crafco Pavement Repair, Equipment, Supplies, Parts, and Repair Services
Infrastructure
Post-Bid
Montpelier, VT

Retainer Contracts for Statewide Site and Earthwork Services
Term Contract
Results
$150,000 est. value

Granite Street Sidewalk Project
Infrastructure
Results
Less than $100,000 est. value
Montpelier, VT 05602

Spruce Place
New Construction - 27,122 SF
Construction
$2,493,540 est. value
Berlin, VT

Yestermorrow Dormitory 1
New Construction - 1,250 SF
Construction
$70,000 est. value
Waitsfield, VT 05673

Bridges (Rialto & Cummings) - City of Montpelier
Infrastructure
Pending Verification
$700,000 CJ est. value
Montpelier, VT 05602

Commercial Building Addition
Addition, Demolition, Infrastructure - 1,440 SF
Pending Verification
$400,000 CJ est. value
Berlin, VT 05602

Hill Street Water Line (Upper) - City of Barre
Infrastructure
Conception
$220,000 CJ est. value
Barre, VT 05641

Last Updated 12/01/2022 11:33 AM
Project Title

RFQ Contractor - 2023 U-32 Main Parking Reconstruction Project

Physical Address View project details and contacts
City, State (County) Montpelier, VT 05602   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,800,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

1. Complete Contractor's Qualification Statement, AIA document A305 or its complete equivalent. 2. Complete list of projects with construction cost over $1,000,000 over the previous 5 years including references with contact person and phone number. 3. List of school projects of similar scope, including references with contact person and phone number. Experience and references will be considerations in evaluating qualifications. PROJECT DESCRIPTION: The project consists of reconstruction and circulation improvements of the main parking lot, bus loop and sidewalks. SCHEDULE: Project is planned to go out to bid no later than December 9, 2022, with construction starting as soon as school is finished in mid-June 2023. Completion is scheduled for mid-August 2023. BONDING: A Bid Bond in the form of AIA A310 will be required for 5% of the Construction Cost. A Performance and Payment Bond in the form of AIA A312 will be required for 100% of the Construction Cost. OTHER REQUIREMENTS: Contractor shall be subject to comply with any and all applicable equal opportunity and nondiscrimination agreements as included in the bid documents. Owner will not discriminate against any person on the basis of race, color, religion, sex, or national origin, familial status or handicap as per Fair Housing Amendments Act of 1988.REQUIREMENTS

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents