Similar Projects
Last Updated | 09/11/2020 04:29 AM |
Project Title | Reconstruction - Chesterfield County |
Physical Address | View project details and contacts |
City, State (County) | SC (Chesterfield County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Mobilization 1.000 Ls Bonds and Insurance 1.000 Ls Traffic Control 1.000 Ls Railroad Insurance and Flagging 001 1.000 Ls Removal & Disposal of Existing Pavement 450.000 Sy Removal & Disposal of Existing Curb 150.000 Lf Unclassified Excavation 2,336.000 Cy Borrow Excavation 407.000 Cy Cement Modified Recycled Base (10" Unif)-curing Method B 19,544.000 Sy Portland Cement for Cement Modified Recycled Base Course 587.000 Ton Maintenance Stone 67.000 Ton Hot Mix Asphalt Base Course - Type B 4,840.560 Ton Liquid Asphalt Binder PG64-22 493.984 Ton Full Depth Asph. Pav. Patching 8" Unif 450.000 Sy Milling Existing Asphalt Pavement 1.5" 7,134.000 Sy Milling Existing Asphalt Pavement 2.0" 15,638.000 Sy Milling Existing Asphalt Pavement (Variable) 1,750.000 Sy Milled-in Rumble Strip 2.520 Mi Hot Mix Asphalt Surface Course Type C 3,489.069 Ton Hot Mix Asphalt Surface Course Type E 754.219 Ton Driveway Paving-surface Type C 296.500 Ton Asphalt Surface Treatment(Single Treatment) 19,544.000 Sy Permanent Construction Signs (Ground Mounted) 796.000 Sf 4" White Broken Lines -(Gaps Excluded)-fast Dry Paint 440.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-fast Dry Paint 46,510.000 Lf 8"White Solid Lines(Crosswalk&channelization)fast Dry Paint 612.000 Lf 24" White Solid Lines (Stop/diagonal Lines)-fast Dry Paint 327.000 Lf White Single Arrow (Left, Straight, Right)-fast Dry Paint 2.000 Ea White Word Message "Only"-fast Dry Paint 1.000 Ea Railroad Crossing Symbols - Fast Dry Paint 4.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 300.000 Lf 4"Yellow Solid Line(Pvt.edge&no Passing Zone)-fast Dry Paint 45,452.000 Lf 4" White Broken Lines(Gaps Excl.)thermoplastic- 90 Mil. 300.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 16,440.000 Lf 8" White Solid Lines Thermoplastic - 125 Mil. 306.000 Lf 24" White Solid Lines (Stop/diag Lines)-thermo.-125 Mil 192.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 2.000 Ea White Word Message "Only" -thermoplastic - 125 Mil. 1.000 Ea Railroad Crossing Symbols - Thermoplastic - 125 Mil. 2.000 Ea 4" Yellow Broken Lines(Gaps Exc)thermoplastic - 90 Mil. 300.000 Lf 4" Yellow Solid Lines(Pvt.edge Lines) Thermo-90 Mil. 16,300.000 Lf Permanent Clear Pavement Markers- Mono-dir.- 4"X4" 4.000 Ea Permanent Yellow Pavement Markers Bi-dir.- 4"X4" 122.000 Ea Furnish & Install 1.0" Schedule 80 Pvc Conduit 40.000 Lf Furnish & Instl No. 14 Copper Wire,1-conductor for Loop Wire 1,270.000 Lf Sawcut for Loop Detector 485.000 Lf F&i-12"X12"X12"D.elec.flush Undgrd.enclos-(Str.poly.conc.)hd 3.000 Ea Catch Basin - Type 9(Top Only) 2.000 Ea Adjust Catch Basin 2.000 Ea Concrete Curb and Gutter(1`-6") Vertical Face 150.000 Lf Detectable Warning Material 225.000 Sf Pedestrian Ramp Construction 450.000 Sy Permanent Grassing for Non-permitted Resurfacing Projects 1.150 Acre |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |