Similar Projects
Regional Water Reclamation Facility Contract 1 - RWRF Expansion
Addition, Demolition, Infrastructure
Bidding
$55,000,000 CJ est. value
Clinton, IA 52732

Regional Water Reclamation Facility Contract 2 - Anaerobic Treatment System
Renovation
Bidding
$27,300,000 CJ est. value
Clinton, IA 52732

Sioux City Elec Maint Bld Water Softener Replacement
Alteration
Post-Bid
Hinton, IA 51024

Cobblestone Hotel & Suites - City of Ottumwa
New Construction, Infrastructure
Post-Bid
$9,900,000 CJ est. value
Ottumwa, IA 52501

Polk County Election Office Fire Suppression, Plumbing, Mechanical and Electrical Repairs
Alteration
Results
Des Moines, IA 50309

Lake Wapello State Park Boy Scout Pond Outlet Replacement
Renovation, Infrastructure
Results
Drakesville, IA 52552

Maquoketa Wastewater Treatment Plant Improvements
Renovation, Infrastructure
Bidding
$12,250,000 CJ est. value
Maquoketa, IA 52060

Install Multiplex Water Softener
Alteration
Post-Bid
$250,000 to $500,000 est. value
Ames, IA 50010

Springreen Apartments Water Main Improvement Project
Infrastructure
Results
$113,984 CJ est. value
Asbury, IA 52002

Linn Grove Dam and Park Restoration
Infrastructure, Renovation
Bidding
$8,000,000 CJ est. value
Linn Grove, IA 51033

WWTP Vertical Loop Reactor Replacement Air Piping
Infrastructure
Post-Bid
$390,000 CJ est. value
Carroll, IA 51401

Wastewater Reclamation Facility Belt Filter Press Improvements
Renovation
Results
$1,991,800 CJ est. value
Des Moines, IA 50317

Knoxville Veteran's Park
Infrastructure
Bidding
$990,000 CJ est. value
Knoxville, IA 50138

2022 Stormwater Intake Repair Program
Infrastructure
Post-Bid
$295,867 CJ est. value
Des Moines, IA 50315

VA District - Phase 1 Improvements
Infrastructure
Results
$3,346,000 CJ est. value
Knoxville, IA 50138

Last Updated 01/16/2023 10:33 AM
Project Title

Sump Pump Abatement Project Alley West of Kelling Street

Physical Address View project details and contacts
City, State (County) Davenport, IA 52804   (Scott County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $149,882 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work includes all labor, materials, tools, supplies, utility and transportation services, equipment and all incidentals necessary for the Bid #23-41 Sump Pump Abatement project. Prices in bid should be free of all sales taxes. Pursuant to Iowa Code sections 422.42 (15) & (16), the awarded contractor will be issued a tax exemption certificate to purchase construction materials (within the state of Iowa) that will be incorporated into real property for this project tax free. For all bids over $100,000, the City of Davenport requires a Bid Bond of 5% of the bid amount. A copy of the front page of the bid bond must be attached in the "Response Attachments" tab of the bid package. Bids over $100,000, submitted without a bid bond will not be considered. Liquidated Damages - The amount of liquidated damages shall be $500 per calendar day. Manufacturer's written warranties and guarantees shall also be required from the awarded bidder. Bidders must include with the bid submittal a Certificate of Insurance for General Liability, Workers Compensation, and Vehicle insurance coverages. The limits of the policies shall be as specified in the "General Contract Conditions", which may be obtained from the City's website. Specifications and contract documents governing the proposed improvements and proceedings of the City Council referring to this proposed improvement are hereby made part of this notice and a proposed contract shall be executed in compliance with the "Instructions to Bidders" and with the "General Contract Conditions". Payments to the contractor for such improvement will be made monthly in warrants as specified in the "General Contract Conditions" by virtue of the statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa and as specified in the "General Conditions". The City reserves the right to reject any or all bids and to waive technicalities and irregularities, if it is deemed in the public interest to do so. Attention is called to the fact that the contractor must ensure that employees and applicants for employment are not discriminated against because of race, color, creed, religion, sex, gender identity or expression, national origin or ancestry, sexual orientation, age, marital status, familial status, physical or mental disabilities or political beliefs and affiliations. otential prime contractors are encouraged to contact DBE sub-contractors. For a listing of certified DBE contractors, visit the State of Iowa's website This project is located along the alley west of Kelling Street, north of West Central Park Avenue. The proposed improvements include, but are not limited to, the furnishing of all labor for the removal of the PCC alley and roadway for the length of the project, full depth aggregate stone base material, geo fabric / grid materials if needed, reconstruction of the alley and roadway with a PCC rigid pavement section, reset all existing utility surface features to finish grade, replacement of the adjacent driveway approaches, reconstruction of sidewalk, topsoil and seeding, and erosion control. The quantities herein represent the Engineer's estimate of the amount of work to be completed. Actual as-built quantities may vary from bid quantities. For all bids over $100,000, the City of Davenport requires a bid bond for 5% of the total amount of the project to be submitted with bid. The front page of the bid bond should be scanned and attached with bid. Bids over $100,000, received without a bid bond, will be considered non-responsive and result in denial of award of the contract. For all bids over $100,000, the awarded contractor will be required to submit a performance bond for 100% of the total amount of the project and a 4-year maintenance bond.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents