Similar Projects
Flooding Repairs - Waisman Center
Bidding
Less than $136,000 est. value
Madison, WI

Approach Channel Entry and Rescue Upgrades
Bidding
Milwaukee, WI

Prospect Road Culvert
Post-Bid
Beaver Dam, WI 53916

Culverts
Term Contract
Post-Bid
WI

Operations Truck Ramp, Scale and Drainage Improvements
Results
Beloit, WI

South Fork Pheasant Branch Creek Repairs to Channel
Results
Madison, WI 53562

River Bend Park Improvements
Bidding
Grafton, WI

Concrete Culverts
Post-Bid
WI

2020 La Crosse River Bank Stabilization
Results
Less than $50,000 est. value
La Crosse, WI 54601

Damon Street Reservoir Rehabilitation
Bidding
Eau Claire, WI 54701

Erosion Control Devices
Term Contract
Post-Bid
WI

Steam Pits 14 Replacement - MEP
Results
Less than $320,000 est. value
Stevens Point, WI 54481

5 Culvert Replacements
Bidding
WI 54757

2021 Gramling Lane Culvert Replacement
Post-Bid
Less than $300,000 est. value
Dousman, WI 53118

Steam Pits 14 Replacement - General
Results
Less than $320,000 est. value
Stevens Point, WI 54481

Reported 04/06/2021 11:41 AM
Project Title

Fountain City Service Base Sustainment & Modernization

Physical Address View project details and contacts
City, State (County) Fountain City, WI   (Buffalo County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The current scope of the project includes but is not limited to: Reviewing the Corps’ documentation on the condition of the current river front as well as any unique site conditions which may impact the design requirements. Design. Designing a straight-line mooring system roughly 1,400 linear feet in length, to include two (2) additional crane cells for the Corps’ 200-ton heavy lift crane, raising the grade on the southern portion of the site to bring it level with the current crane cell, improved shore lighting, providing the Corps the ability to dock their fleet directly against the vertical face, and provide shore power and water to the vessels. Fabrication and installation of the system. Work will include dredging and earthwork to allow for installation of the quayside, constructing the mooring solution (ex: forming and pouring concrete or driving pile), anchoring the vertical face into the current riverbed to support crane loads, and running power and water lines to the new quayside.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging, Shoreline Protection, Waterway Construction and Equipment.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists, Cranes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents