Similar Projects
30Yrd and 40Yrd Roll-Off Trash Service
Term Contract
Post-Bid
West Columbia, SC

Trash Removal
Term Contract
Post-Bid
West Columbia, SC 29172

Refuse Collection
Term Contract
Post-Bid
Columbia, SC

Refuse Collection and Disposal Services
Term Contract
Post-Bid
Columbia, SC

Transfer Station Wastewater Pumping, Hauling and Disposal
Term Contract
Post-Bid
SC

Electronic Waste Transportation and Recycling Services (Term Contract)
Term Contract
Post-Bid
Lexington, SC

Districtwide Recycling Services
Term Contract
Post-Bid

Removal And Disposal Services
Term Contract
Post-Bid
Columbia, SC

4Yrd and 8Yrd Trash Service
Term Contract
Post-Bid
West Columbia, SC

Waste Collection Services
Infrastructure
Post-Bid
Lexington, SC

Snow Plow Attachments
Term Contract, Infrastructure
Post-Bid
Columbia, SC

Wood Grinding and Compost Facility
Term Contract
Results
Lexington, SC

Waste Tire Recycling
Term Contract
Post-Bid
Lexington, SC

SCDC Midlands Refuse Collection
Term Contract
Post-Bid
Columbia, SC

RFP for Natural Gas Supply and Asset (Capacity & Storage) Management Services
Term Contract
Post-Bid

Last Updated 05/24/2022 03:20 AM
Project Title

Wastewater Pumping, Hauling and Disposal

Physical Address View project details and contacts
City, State (County) Lexington, SC   (Lexington County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Term contract for pumping of wastewater from an 8,000-gallon storage tank (UST), and a 10,000-gallon storage tank (UST) located at the Edmund Landfill Transfer Station and hauling to a designated wastewater disposal site. This wastewater is generated from the wash down of the floor area, rainwater and domestic waste. Approximately 93,675 gallons of wastewater were disposed of in past fiscal years. Additionally, the qualified offeror will be required to pump solids from the bottom of both tanks and haul to a designated disposal site for processing, approximately once per year. 2. The successful offeror must have the ability to pump into their hauling vehicle through a 4” suction pipe from the two separate wastewater tanks, transport and discharge the wastewater from the Transfer Station facilities to a wastewater treatment plant (WTP). 3. Wastewater from the County’s older Transfer Station collects in an 8,000-gallon underground storage tank (UST) equipped with an alarm device, which will provide a visual and audible signal when the tank reaches 50 percent capacity (4,000 gallons) and 75 percent (6000 gallons). Wastewater from the new transfer station expansion collects in a 10,000-gallon underground storage tank (UST) equipped with an alarm device, which will provide a visual and audible signal when the tank reaches 50 percent capacity (5,000 gallons) and 80 percent capacity (8,000 gallons). The Transfer Station will notify the successful offeror when either UST has reached 50 percent capacity and that the UST may be evacuated.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents