Similar Projects
Last Updated | 09/26/2022 06:32 PM |
Project Title | Lyceum Theater Renovation |
Physical Address | View project details and contacts |
City, State (County) | San Diego, CA 92101 (San Diego County) |
Category(s) | Entertainment/Recreation |
Sub-Category(s) | Swimming Pool(s) |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $7,947,429 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of September 13th, 2022, project has not been awarded yet. It is expected to be awarded in the next 2 weeks from now. License Requirements: B Liquidated Damages: $1,000.00 Online Q&A: Yes Q&A Deadline: 06/15/2022 3:00 PM (PDT) The work generally consists of renovation of two theatre spaces located within the Lyceum Theatre; the 'Main Stage' and the 'Black Box' theatres. Audience areas within the Main Stage will receive new fixed theatre seating, flooring, fire protection modifications, new doors/hardware and finishes. Within the Black Box a new portable audience seating system will be installed. Stage area improvements common to both theatres will consist of upgraded theatrical rigging, and theatrical lighting and audio/visual equipment, as well as HVAC modifications to improve heating and cooling. The Main Stage will also receive a modular stage flooring system. Dressing room areas are currently included in the project as an additive alternate and will be incorporated into the Project, budget permitting. Dressing room areas would receive plumbing, electrical power, lighting, and HVAC modifications to accommodate the revisions to the floor plan. Structural modifications will be made throughout the theatre spaces to facilitate the above-mentioned improvements. Demolition of miscellaneous existing improvements throughout the space are required to make way for the new improvements. Civic San Diego has incorporated the City's mandatory SLBE-ELBE subcontractor participation percentages to enhance competition and maximize subcontracting opportunities. For the purpose of achieving the mandatory subcontractor participation percentages, a recommended breakdown of the SLBE and ELBE subcontractor participation percentages based upon certified SLBE and ELBE firms has also been provided to achieve the mandatory subcontractor participation percentages: 1. SLBE participation 3.7% 2. ELBE participation 6.9% 3. Total mandatory participation 10.6% This is a Prevailing Wage project pursuant to Section 1720 et seq. of the Labor Code. Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. No bid will be accepted nor any contract entered into without proof of the successful bidder's and all subcontractors' current registration with the Department of Industrial Relations to perform public work. Completion- 266 working days |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |