Similar Projects
Lawrence C. Smith Memorial Airport Hanger B Structural Repairs
Renovation
Bidding
$804,000 CJ est. value
Harrisonville, MO 64701

Airport - Construct Hangars - WP2155 - City of West Plains
New Construction, Infrastructure
Conception
$722,000 CJ est. value
West Plains, MO 65775

Air Force Civil Engineering Center (AFCEC) Fire Protection
Term Contract
Post-Bid
$9,500,000 CJ est. value
Kansas City, MO 64106

Lee's Summit Municipal Airport Hangar 2 - City of Lees Summit
Infrastructure
Conception
$9,750,000 CJ est. value
Lees Summit, MO 64064

T-Hanger Installation
New Construction, Infrastructure - 6,660 SF
Results
$366,500 CJ est. value
Lebanon, MO 65536

Jerry Sumners, Sr. Aurora Municipal Airport (2H2)
New Construction, Infrastructure
Results
$835,677 CJ est. value
Aurora, MO 65605

Cape Girardeau Mechanic & Maintenance Building
New Construction, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Scott City, MO 63780

Last Updated 12/19/2023 08:22 AM
Project Title

Renovate Restrooms and Showers Whiteman Air Force Base - Readiness Center

Physical Address View project details and contacts
City, State (County) Whiteman Air Force Base, MO 65305   (Johnson County)
Category(s) Transportation
Sub-Category(s) Aircraft Hangar
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $401,500 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes interior renovations to the men's and women's restroom and shower areas at the Whiteman Air Force Base Readiness Center. MBE/WBE/SDVE Goals: MBE 10%, WBE 10%, and SDVE 3%. NOTE: Only MBE/WBE firms certified by the State of Missouri Office of Equal Opportunity as of the date of bid opening, or SDVE(s) meeting the requirements of Section 34.074, RSMo and 1 CSR 30-5.010, can be used to satisfy the MBE/WBE/SDVE participation goals for this project. The State reserves the right to reject any and all bids and to waive all informalities in bids. No bid may be withdrawn for a period of 20 working days subsequent to the specified bid opening time. The contractor shall pay not less than the prevailing hourly rate of wages for work of a similar character in the locality in which the work is performed, as determined by the Missouri Department of Labor and Industrial Relations and as set out in the detailed plans and specifications.

Details

Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Rigid Paving, Concrete Paving, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents