Similar Projects
Alexander Street Apartments
New Construction - 25,000 SF
Design
$177,300,000 est. value
Yonkers, NY 10701

North Salem MS/HS School - Athletic Fields Improvements and Restroom Addition
Renovation, Addition
Bidding
North Salem, NY 10560

CJC Tennis Court Re-Surfacing
Post-Bid
Cortlandt Manor, NY 10567

Rye Neck UFSD - Rubber Resurfacing for Playground Swing Area
Post-Bid
Mamaroneck, NY 10543

MA Riis Park Improvements Phase 2B
Results
Harrison, NY 10528

Barton Park Renovation
Results
Yonkers, NY 10703

The Learning Experience
Renovation - 14,000 SF
Construction
$1,800,000 est. value
Tuckahoe, NY 10707

Candlewood Park Improvement District Pillars Renovation
Post-Bid
North Salem, NY

Hudson Plaza Park
Results
Less than $246,343 est. value
Sleepy Hollow, NY 10591

Pelton Park Field Repair
Post-Bid
Yonkers, NY 10705

Washington Avenue Park Playground Improvements
Results
Greenburgh, NY 10607

Materials to Repair Bleachers at Groton HS
Renovation
Post-Bid
Yonkers, NY

Charles J. Cook Pool Complex Tennis Court Resurfacing
Results
Cortlandt Manor, NY 10567

Croton Avenue Pickleball Court
Post-Bid
NY 10567

Playground Rubber Resurfacing for Two Elementary School Playgrounds
Results
Mamaroneck, NY 10543

Last Updated 12/10/2021 09:27 AM
Project Title

Construction Management Firm for Walter Panas High School Athletic Fields, Tennis Courts and Stormwater Pollution Prevention Plan Project

Physical Address View project details and contacts
City, State (County) Shrub Oak, NY 10567   (Westchester County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction Management Firm with in-house electrical, environmental, mechanical, site work and sophisticated drainage systems expertise. The selected Firm will be expected to work in conjunction with the Engineers and District’s Facility Director. The Construction Manager should inspect the work being done and ensure that it is of acceptable quality, on time, within the budget and work is performed according to local code requirements. The project consists of removing and regrading the athletic fields and tennis courts, as well as other related work referenced below at Walter Panas High School located at 300 Croton Avenue, Cortlandt Manor, NY 10567. The project will consist of installing synthetic turf, fences, batting cages, modular dugouts, detention systems, bioretention basin, and site lighting. Other related work shall also include drainage, lighting, stairway, parking lot, septic tank removal and replacement, clearing and grubbing, excavation, backfilling, trenching, drainage pipe, concrete, asphalt pavement, electrical work, water piping, topsoil, seeding, restoration, and cleaning the project area all in accordance with the plans and specifications (copy link below) or as directed by the Engineer.

Details

Park/Playground, New Construction.
Division 01 - General Requirements, Temporary Controls, Temporary Storm Water Pollution Control.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents