Similar Projects
Sheetz / South Bloomfield
New Construction, Infrastructure - 6,077 SF
Conception
$1,600,000 CJ est. value
South Bloomfield, OH 43103

Winchester Road Residential Development
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Ashville, OH 43103

Jobs and Family Services Parking Lot Resurfacing
Infrastructure
Bidding
$187,395 CJ est. value
Circleville, OH 43113

PIC-CR VAR PM-FY2023 (Pavement Markings)
Infrastructure
Bidding
$435,164 CJ est. value
Circleville, OH 43113

Cedar Heights Road Phase 3
Infrastructure
Post-Bid
$750,000 CJ est. value
Circleville, OH 43113

SR 134 - Culvert Replacement
Infrastructure
Post-Bid
$641,000 CJ est. value
Lynchburg, OH 45142

2022 Paving Rehabilitation - Round 1
Infrastructure
Results
$617,887 CJ est. value
Circleville, OH 43113

Construction of a Single Lane Roundabout at the Intersection of Walnut Creek Pike (CR7) and Bell Station Road (TR39)
Infrastructure
Results
$1,928,843 CJ est. value
Scioto Township, OH 43103

Chipmunk Solar Project
New Construction, Infrastructure
Pending Verification
$78,000,000 CJ est. value
South Bloomfield, OH 43103

Scioto Farms Solar Project
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Circleville, OH 43113

2023 Pickleball Courts Barthelmas Park
Infrastructure
Bidding
$105,000 CJ est. value
Circleville, OH 43113

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

Well No.4 project
Infrastructure
Results
$190,000 CJ est. value
South Bloomfield, OH 43103

SR 665 - Spot Patching / Pavement Repair
Infrastructure
Bidding
$849,000 CJ est. value
Orient, OH 43146

RFQ Construction Manager at Risk (CMAR) Services - Ted Lewis Park Project
Infrastructure
Post-Bid
$200,000 CJ est. value
Circleville, OH 43113

Last Updated 04/06/2023 03:55 PM
Project Title

RFQ Construction Manager at Risk - PCI (Pickaway Correctional Institution) New Housing

Physical Address View project details and contacts
City, State (County) Orient, OH 43146   (Pickaway County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Prison/Jail, Site Development
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status All Bids Received, Results Expected, Request for Qualifications, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $45,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The State intends to select a Construction Manager at Risk (CMR) to assist with design and to provide construction services for an expanded facility at the Pickaway Correctional Institution. The project will include multiple buildings, structures, site work, utility construction and coordination of many disciplines, consultants, contractors and stakeholders. Pickaway Correctional Institution (PCI) was opened as a correctional facility in 1984 in Orient, Ohio just south of Columbus. Dating back to the 1920's, this facility was one of Ohio's mental health hospitals. Many buildings on the campus are former hospital buildings and are in poor condition. This project will replace some of the residential buildings. The following list of anticipated facilities and scope categories are in order of priority and will be completed as funds allow. This project will extend over multiple State budget cycles; funds may be added to complete more items 1. Demolition. Removal of structures, pavement, utilities, site amenities to facilitate construction of the new facilities. 2. Site Preparation. Excavation, utilities, roads, walks and extensive preparatory work for approximately 50-acre site. 3. Housing Community consisting of approximately 100,000 SF of residential buildings - three 30,000 SF mirror image housing units and one 10,000 SF activities/administration building. Design work is almost complete, with CD level building plans for the structures. The successful CMR firm will assist the design team in completion of construction documents for site, utility, demolition, perimeter fence and associated site-specific plans and specifications. 4. Perimeter Fence consisting of removal/replacement/construction of new secure perimeter fence of approximately 4,000 LF to enclose the new facilities and connect the new area to the current PCI campus. 5. Vehicular Sally Port consisting of relocation of current VSP. The existing VSP will be inside the fenced area of the new construction, so a new VSP will be constructed to service the campus. Submit all questions regarding this RFQ in writing to OFCC Procurement at procurement@ofcc.ohio.gov with the project number included in the subject line (no phone calls please). Questions will be answered and posted to Opportunities page on the OFCC website Construction is anticipated to begin in 2023 for demolition, site prep and the Housing Community (housing community design is almost complete). Bidding strategies, planning and design of remaining scope items and categories is expected to be completed by the design team and the CMR firm in a manner that most efficiently utilizes available resources Professional design services have been acquired by the Contracting Authority under a separate contract. Information that is currently available will be shared with CMR candidate firms during the short list and interview process; some information is also available via our website with a search for PCI. The Program of Requirements (POR) as well as other design stage deliverables will be developed by the entire project team and will commence immediately upon award. All aspects of the project and related issues will be implemented and operated consistent with the Contracting Authority and/or Owner's policies and procedures. CM Preconstruction Services Start 07 / 23 Construction Stage Notice to Proceed 11 / 23 Substantial Completion of all Work 11 / 25 CM Services Completed 12 / 25 Submit all questions regarding this RFQ in writing to OFCC Procurement at procurement@ofcc.ohio.gov

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents