Similar Projects
Americare Senior Living / Jefferson City
New Construction, Infrastructure
Design
$5,506,601 CJ est. value
Jefferson City, MO 65101

Missouri River Regional Library Expansion
Addition, Demolition, Renovation, Infrastructure - 15,000 SF
Design
$4,200,000 CJ est. value
Jefferson City, MO 65101

Paving Repairs-MSHP General Headquarters
Infrastructure
Bidding
$90,000 CJ est. value
Jefferson City, MO 65101

Paving Repairs-MSHP General Headquarters
Infrastructure
Bidding
$90,000 CJ est. value
Jefferson City, MO 65101

Central Office Lab Parking Lot Asphalt Resurfacing
Infrastructure
Post-Bid
MO

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

MODOT Statewide Permanent Roadside Delineation
Infrastructure
Results
Jefferson City, MO 65109

Resurface
Infrastructure
Results
$1,000,000 to $2,500,000 est. value

Health Department Driveway Project
Infrastructure
Construction
$180,637 CJ est. value
Jefferson City, MO 65101

Health Department Driveway Project
Infrastructure
Construction
$180,637 CJ est. value
Jefferson City, MO 65101

Dogwood Park Duplexes
New Construction, Infrastructure
Pending Verification
$3,017,600 CJ est. value
Jefferson City, MO 65101

Edwards Ridge
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Jefferson City, MO 65109

Cole County EMS New Building / Jefferson City
New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Jefferson City, MO 65101

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Tanner Bridge Road Alignment Improvements
Infrastructure
Results
Jefferson City, MO 65111

Last Updated 05/03/2023 11:31 PM
Project Title

Air Street SW Phase II and Sanitary Sewer 2023

Physical Address View project details and contacts
City, State (County) Jefferson City, MO 65109   (Cole County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $536,945 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

It'll include the furnishing of all material, labor, and equipment to replace the stormwater system from Air View to Orchard Ln. and replace the sewer system from MH4525 to MH 5414, along with related improvements and construction necessities such as sidewalk ramp and traffic control. Plans may be obtained electronically, at no cost. All prospective bidders are urged to attend.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents