Similar Projects
Last Updated | 12/23/2022 02:02 AM |
Project Title | SR 525 - Clinton Ferry Terminal Vicinity Pedestrian Connectivity |
Physical Address | View project details and contacts |
City, State (County) | Coupeville, WA 98239 (Island County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $964,953 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project is located within the town of Clinton, Whidbey Island, Island County, Washington. The Project is located on SR 525 from Milepost (MP) 8.51 to MP 8.96 within Section 24 of Township 29 North, Range 3 East and Section 30 of Township 29 N, Range 4 E (Willamette Meridian). The Project will enhance pedestrian connectivity by improving the pedestrian access route between the Washington State Ferry Terminal and the Transit Park and Ride. Structures that will be modified include sidewalks, roadbeds, illumination, and drainage improvements. Lighting improvements, ADA compliance and safety. Work associated with the project includes placing curbing, sidewalk repair, lighting, traffic control and other work. Estimated value $750,000 - $1,000,000 14 working days WADOT - SR 525, Clinton Ferry Terminal Vicinity Pedestrian Connectivity *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |