Similar Projects
SR 20/Eagle Vista Dr to Ault Field Rd Vic - ADA Compliance
Infrastructure
Design
$609,000 CJ est. value
Oak Harbor, WA 98277

SR 20/Eagle Vista Dr to Ault Field Rd Vic - ADA Compliance
Infrastructure
Design
$609,000 CJ est. value
Oak Harbor, WA 98277

2022 Sanitary Sewer Rehabilitation Project (Pipe-bursting)
Infrastructure
Bidding
$550,000 CJ est. value
Oak Harbor, WA 98277

Upgrade and Relocate Existing Watermains
Infrastructure
Bidding
$500,000 CJ est. value
Coupeville, WA 98239

Fakkema Access Road
Infrastructure
Post-Bid
$650,000 to $850,000 est. value
Oak Harbor, WA 98277

Tower Site Readiness Phase II Project
Infrastructure
Post-Bid
Camano Island, Darrington, Everett, Kingston, Marysville, Mountlake Terrace, WA 98208

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

SR 20/Boon Rd Vic to Eagle Vista Dr Vic - Paving
Infrastructure
Design
$1,241,000 CJ est. value
Coupeville, WA 98239

Demolition and Parking Lot Construction Engle Road
Infrastructure
Post-Bid
Coupeville, WA 98239

2022 to 2023 Unit Price Directional Boring Contract
Term Contract
Results
$2,000,000 est. value
Camano Island, WA

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

SR 525, Clinton Ferry Terminal Vicinity Pedestrian Connectivity
Infrastructure
Results
$750,000 to $1,000,000 est. value
WA

Hoypus Point Restoration
Infrastructure
Post-Bid
$200,000 to $240,000 est. value
Oak Harbor, WA

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

Last Updated 12/23/2022 02:02 AM
Project Title

SR 525 - Clinton Ferry Terminal Vicinity Pedestrian Connectivity

Physical Address View project details and contacts
City, State (County) Coupeville, WA 98239   (Island County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $964,953 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project is located within the town of Clinton, Whidbey Island, Island County, Washington. The Project is located on SR 525 from Milepost (MP) 8.51 to MP 8.96 within Section 24 of Township 29 North, Range 3 East and Section 30 of Township 29 N, Range 4 E (Willamette Meridian). The Project will enhance pedestrian connectivity by improving the pedestrian access route between the Washington State Ferry Terminal and the Transit Park and Ride. Structures that will be modified include sidewalks, roadbeds, illumination, and drainage improvements. Lighting improvements, ADA compliance and safety. Work associated with the project includes placing curbing, sidewalk repair, lighting, traffic control and other work. Estimated value $750,000 - $1,000,000 14 working days WADOT - SR 525, Clinton Ferry Terminal Vicinity Pedestrian Connectivity *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents