Similar Projects
Grade, Drain and Surface
Infrastructure
Design
$10,287,547 CJ est. value
Sand Springs, OK 74063

Woodstock Sanitary Sewer Rehabilitation
Infrastructure
Bidding
$759,512 CJ est. value
Broken Arrow, OK 74012

Flow Equalization Basin Joint and Crack Repair
Infrastructure
Bidding
$1,000,000 est. value
Tulsa, OK

The University of Tulsa Softball Complex Batting Cage
Infrastructure
Sub-Bidding
$250,000 CJ est. value
Tulsa, OK 74104

Tulsa Classical Academy
New Construction, Infrastructure
Sub-Bidding
$1,200,000 CJ est. value
Tulsa, OK 74133

Kendalwood Park North Drainage Improvement Project
Infrastructure
Post-Bid
Glenpool, OK

Sand Springs Franklin Creek Channel Improvement at Case Park Soccer Complex
Infrastructure
Post-Bid
Sand Springs, OK

112th Street Culvert Improvements Project
Infrastructure
Results
Jenks, OK

Natchez Street Tributary
Infrastructure
Results
Broken Arrow, OK

2022 Capital Improvements
Infrastructure
Bidding
$600,000 CJ est. value
Jenks, OK 74037

Indian Springs Culvert Improvements
Infrastructure
Post-Bid
Broken Arrow, OK 74011

Grade, Drain, and Surface
Infrastructure
Results

Wastewater Collection System Rehabilitation: Lynn Lane WWTP(Wastewater Treatment Plant) Subbasin LL34 and Covington Sewer
Infrastructure
Bidding
$1,087,000 CJ est. value
Broken Arrow, OK 74011

Bixby Public Schools Academic Building - Earthwork and Storm Sewer
Infrastructure
Post-Bid
$130,000 est. value
Bixby, OK 74008

Paving and Drainage Improvements Replacement of Bridge 120 Over Rock Creek
Infrastructure
Results
$900,000 est. value
Tulsa, OK

Last Updated 07/22/2022 04:33 PM
Project Title

Cherry Creek Channel Lining Reconstruction

Physical Address View project details and contacts
City, State (County) Tulsa, OK 74103   (Tulsa County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $362,313 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing All Tools, Materials and Labor and Performing the Work Necessary to Be Done in the Construction of the Following: Cherry Creek Channel Lining Reconstruction the Entire Cost of the Improvement. Bids Will Be Accepted by the City Clerk From the Holders of Valid Pre-qualifications Certificates From the City of Tulsa in One or More of the Following Classifications: a or D Drawings, Specifications and Contract Documents for Construction of Said Public Improvements of the Said Project Have Been Adopted by the Mayor of Said City. Contract Requirements Shall Include Compliance as Required by Law Pertaining to the Practice of Nondiscrimination in Employment. The Overall Aspirational Small Business Enterprise Utilization Goal for This Project Is Ten (10) Percent. Attention Is Called to Resolution No. 18145 of August 23, 1988, Requiring Bidders to Commit to the Goal of Employing on the Project at Least Fifty Percent Bona Fide Residents of the City of Tulsa and/or Msa in Each Employment Classification. Attention Is Called to Resolution 7404 of November 8, 2006, Requiring Bidders, Their Subcontractors and Their Lower-tier Subcontractors to Hire Only Citizens of the United States. The City of Tulsa Itself Is Exempt From the Payment of Any Sales or Use Taxes, and Pursuant to Title 68 O.s. Section 1356(10), Direct Vendors to the City Are Also Exempt From Those Taxes. A Bidder May Exclude From His Bid Appropriate Sales Taxes, Which He Will Not Have to Pay While Acting for and on Behalf of the City of Tulsa. A Certified or Cashier's Check or Bidders Surety Bond, in the Sum of 5% of the Amount of the Bid Will Be Required From Each Bidder to Be Retained as Liquidated Damages in the Event the Successful Bidder Fails, Neglects or Refuses to Enter Into Said Contract for the Construction of Said Public Improvements for Said Project and Furnish the Necessary Bonds Within Thirty Days From and After the Date the Award Is Made. The Bidder to Whom a Contract Is Awarded Will Be Required to Furnish Public Liability and Workmen's Compensation Insurance; Performance, Statutory, and Maintenance Bonds Acceptable to the City of Tulsa, in Conformity With the Requirements of the Proposed Contract Documents. The Performance, Statutory, and Maintenance Bonds Shall Be for One Hundred Percent (100%) of the Contract Price. All Bids Will Be Opened and Considered by the Bid Committee of Said City at a Meeting of Said Committee to Be Held in the City Council Room of City Hall in Said City at 9:00 a.m.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents