Similar Projects
Last Updated | 02/13/2019 04:27 AM |
Project Title | Full-Depth Patching, Milling, Thin Overlay |
Physical Address | View project details and contacts |
City, State (County) | (Georgetown, Horry Counties) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Csx Railroad Insurance And Flagging 001 1.000 Ls Borrow Excavation 3,820.000 Cy Maintenance Stone 27.500 Ton Liquid Asphalt Binder Pg64-22 1,675.613 Ton Full Depth Asph. Pav. Patching 8" Unif 2,750.000 Sy Surface Plane Asphalt Pavement - Variable 257,184.000 Sy Milling Existing Asphalt Pavement (Variable) 1,820.000 Sy Milled-In Rumble Strip 34.800 Mi Hot Mix Asphalt Surface Course Type d 12,337.267 Ton Hot Mix Asphalt Surface Course Type e 12,862.041 Ton Driveway Paving-Surface Type d 989.375 Ton Permanent Construction Signs (Ground Mounted) 4,732.000 Sf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 4,960.000 Lf 6" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 41,360.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 199,040.000 Lf 6" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 110,380.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 20,420.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 42.000 Ea White Word Message "Only"-Fast Dry Paint 22.000 Ea Railroad Crossing Symbols - Fast Dry Paint 4.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 11,320.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 177,940.000 Lf 6"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 92,440.000 Lf 24" Yellow Diagonal Lines - Fast Dry Paint 2,960.000 Lf 6" White Broken Lines -(Gaps Excluded) Epoxy Paint 160.000 Lf 6" Black Broken Lines -(Gaps Excluded) Epoxy Paint 180.000 Lf 6" White Solid Lines (Pvt. Edge Lines) Epoxy Paint 600.000 Lf 6"Yellow Solid Lines-Pvt.Edge&No Pass. Zone - Epoxy Paint 600.000 Lf 4" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 2,480.000 Lf 6" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 20,680.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 99,488.000 Lf 6" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 55,190.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Thermo.-125 Mil 10,210.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 21.000 Ea White Word Message "Only" -Thermoplastic - 125 Mil. 12.000 Ea Railroad Crossing Symbols - Thermoplastic - 125 Mil. 2.000 Ea 4" Yellow Broken Lines(Gaps Exc)Thermoplastic - 90 Mil. 5,660.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 88,934.000 Lf 6" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 46,220.000 Lf 24" Yellow Solid Lines - Thermoplastic - 125 Mil. 1,480.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 1,321.000 Ea Permanent Yellow Pavement Markers Mono-Dir.- 4"x 4" Perm. Yel. 49.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 928.000 Ea Removal Of Pavement Markings 152,670.000 Lf Permanent Grassing For Non-Permitted Resurfacing Projects 13.315 Acre | ||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |