Similar Projects
Montgomery Run Bridge
Infrastructure
Conception
$1,724,577 CJ est. value
Curwensville, PA 16833

Montgomery Run Bridge
Infrastructure
Conception
$1,724,577 CJ est. value
Curwensville, PA 16833

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

Industrial Park Road
Infrastructure
Bidding
$1,000,000 CJ est. value
Lawrence Township, PA 16830

Industrial Park Road
Infrastructure
Bidding
$1,000,000 CJ est. value
Lawrence Township, PA 16830

Milling of Bituminous Paving Notch
Infrastructure
Post-Bid
Woodland, PA

Bituminous Seal Coat
Infrastructure
Post-Bid
Woodland, PA

Bridge Painting and Concrete Repair at Indian Rock Dam, Foster J. Sayers Dam & Curwensville Dam
Renovation
Results
$500,000 to $1,000,000 est. value
Curwensville, Howard, PA 16841

Plum Street Improvements Phase 7
Infrastructure
Results
$50,000 est. value

KeyState Natural Gas Synthesis Plant
New Construction, Infrastructure
Pending Verification
$900,000,000 CJ est. value
Pottersdale, PA 16871

Section 7-F Sanitary Sewer Project
Infrastructure
Pending Verification
$300,000 CJ est. value
Treasure Lake, PA 15801

SR 4009 Conrail Bridge
Infrastructure
Conception
$2,572,889 CJ est. value
Dubois, PA 15801

SR 1003 - Brady Twp Line to SR 1001
Infrastructure
Design
$2,899,132 CJ est. value
Henderson Township, PA 16652

Milling of Bituminous Paving Notch
Infrastructure
Post-Bid
Morrisdale, PA

Last Updated 04/13/2023 02:33 AM
Project Title

SR 255 over Muddy Run

Physical Address View project details and contacts
City, State (County) Dubois, PA 15801   (Clearfield County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected December 2024
Bids Due View project details and contacts
Estimated Value $1,327,351 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Clearfield County Sandy Township SR 255 over Muddy Run Primary Improvement Type: Bridge Improvement As of April 13, 2023, the project is in development stage. Anticipated letting date is October 10, 2024. PennDOT - SR 255 over Muddy Run *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents