Similar Projects
Starbuck TI - Centerra Marketplace / Lebanon
New Construction, Infrastructure - 2,000 SF
Conception
$450,000 CJ est. value
Lebanon, NH 03766

Starbuck TI - Centerra Marketplace / Lebanon
New Construction, Infrastructure - 2,000 SF
Conception
$450,000 CJ est. value
Lebanon, NH 03766

Hopkins Center for the Arts - Dartmouth College
Addition, Demolition, Renovation, Infrastructure - 70,000 SF
Design
$88,000,000 CJ est. value
Hanover, NH 03755

James W Campion III Rink Expansion
Addition, Infrastructure - 56,570 SF
Design
$10,000,000 CJ est. value
West Lebanon, NH 03784

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2022 Roadway Improvements Project No 1
Infrastructure
Results
Lebanon, NH

2022 Roadway Improvements - Project No. 3
Infrastructure
Results
Lebanon, NH

Mary Hitchcock Memorial Hospital Emergency Room Expansion
Addition, New Construction, Infrastructure - 13,232 SF
Pending Verification
$2,600,000 CJ est. value
Lebanon, NH 03766

Mary Hitchcock Memorial Hospital Emergency Room Expansion
Addition, New Construction, Infrastructure - 13,232 SF
Pending Verification
$2,600,000 CJ est. value
Lebanon, NH 03766

Geokon Inc Office Building
New Construction, Infrastructure - 15,528 SF
Design
$3,300,000 CJ est. value
Lebanon, NH 03766

New Secure Entry and Possible Handicapped Accessibility Renovation Project
Renovation, Infrastructure
Post-Bid
$1,500,000 CJ est. value
Monroe, NH 03771

2022 Roadway Improvements Project No 2
Infrastructure
Results
Lebanon, NH

Saber Mountain Properties Mixed-Use Building
New Construction, Infrastructure - 6,046 SF
Pending Verification
$1,000,000 CJ est. value
Lincoln, NH 03251

South Main Street Bridge Replacement #062-117 - City of Lebanon
Infrastructure
Design
$5,000,000 CJ est. value
West Lebanon, NH 03784

Last Updated 07/11/2023 08:33 PM
Project Title

Kimball Street and Forest Avenue Roadway Reconstruction Project

Physical Address View project details and contacts
City, State (County) Lebanon, NH 03766   (Grafton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $4,818,197 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes a full depth roadway reconstruction including new replacement water, sewer, and drainage systems for approximately 1300 ft of Kimball Street and approximately 1300 ft of Forest Avenue. The proposed project includes the following: Replacement of the existing 6, 8, 12, and 15-inch VCP and PVC sewer main with 6, 8, 12, and 15-inch PVC (SDR-35) sewer main. Replacement of the existing 6, 8, and 10-inch cast iron water main with 8 and 12-inch ductile iron water main. Replacement of the existing 6, 8, 12, and 15-inch PVC and VCP stormwater pipe with 16-inch ductile iron and 12, 18, 24, and 30-inch Polypropylene stormwater pipe. Installation of a new roadway box (4.5" pavement, 6" crushed stone (fine gradation), 12" crushed stone (coarse gradation), with spot locations of 12" sand), curbs, and sidewalks on Kimball Street. A staging area of approximately 12,000 sq ft of existing gravel parking area off of Spring Street is also included in the project limits and resource analyses completed to date. There is approximately 5,000 SF of impacts outside the Right of Way (ROW): mostly driveway, walkway, and grading (slope and yard) construction activities. Existing sidewalk at the corner of Kimball and Shaw is outside the ROW and is being replaced. Existing manhole and drainage on Forest from 506+50 to 506+90 RT is outside the ROW and is being replaced. Existing 12" drainage and manhole from Forest (Sta. 506+50 RT) to Shaw (Sta. 40+80 LT) is being filled and abandoned. Existing 10" waterline from Kimball (Sta. 211+85 RT) to Forest (508+25 LT) is being filled and abandoned. Contractor Selection Date:May 10, 2023 Question Submission Deadline:April 12, 2023, 10:00am Question Response Deadline:April 18, 2023, 12:00pm Substantial Completion:May 23, 2024 Extended Question Submission Deadline May 8, 2023, 10:00am Bid Results: Kimball Street Nott's Excavating, Inc $2,838,091.00 ForestAvenue Nott's Excavating, Inc $1,980,106.20 Question Response Deadline May 11, 2023, 12:00pm

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents