Similar Projects
Lucky Star Wind Farm
New Construction, Infrastructure
Conception
$650,000,000 CJ est. value
Medicine Bow, WY 82329

Street Reconstruction - Pierce/Curtis Intersection - MCW-CP24-010 - City of Laramie
Infrastructure
Conception
$485,000 CJ est. value
Laramie, WY 82070

TransWest Express Transmission Project
New Construction, Infrastructure
Design
$3,000,000,000 CJ est. value
Rawlins, WY 82301

Two Rivers North Wind Farm
New Construction, Infrastructure
Design
$540,000,000 CJ est. value
Medicine Bow, WY 82329

County Road 16 1/2 (Georgia Pacific Rd)
Infrastructure
Bidding
$5,959,446 CJ est. value
Greybull, WY 82426

County Road 16 1/2 (Georgia Pacific Rd)
Infrastructure
Bidding
$5,959,446 CJ est. value
Greybull, WY 82426

Annual Trenching and Boring Services
Term Contract
Post-Bid
Gillette, WY

University of Wyoming Halls and Dining - Subcontractors and Suppliers
New Construction, Infrastructure, Renovation
Post-Bid
$170,000,000 CJ est. value
Laramie, WY 82070

Reynolds Sanitary Sewer - Phase 2
Infrastructure
Results
$543,826 CJ est. value
Laramie, WY 82072

North Tank and Pipeline Project
Infrastructure
Results
$18,148,591 CJ est. value
Laramie, WY 82070

U-Haul of Gillette
New Construction, Infrastructure - 38,264 SF
Pending Verification
$4,000,000 CJ est. value
Gillette, WY 82718

Rail Tie Wind Project
New Construction, Infrastructure
Pending Verification
$500,000,000 CJ est. value
Tie Siding, WY 82084

Street Rehabilitation - Joanna Bruner - MCW-CP24-011 - City of Laramie
Infrastructure
Conception
$780,000 CJ est. value
Laramie, WY 82072

Laramie Valley Chapel
Demolition, New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Laramie, WY 82070

Lift Station Rehabilitation
Demolition, New Construction, Infrastructure
Bidding
$850,000 CJ est. value
Gillette, WY 82716

Last Updated 03/23/2023 04:59 PM
Project Title

Gateway D2.2 Proposed Transmission Line Project

Physical Address View project details and contacts
City, State (County) Winton, WY 82945   (Sweetwater County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Roadway Lighting, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected September 2026
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project is a proposed new 500 kilovolt AC transmission line approximately 143 miles from the Shirley Basin Substation to the Anticline Substation. The project is expected to deliver up to 1,100 megawatts (MW) of additional wind energy. The project appeared before the Planning Commission for the County of Sweetwater on March 21, 2023, and is under review. No other applications or building permits have been submitted. Information regarding the architect and general contractor has not been disclosed. A firm construction timeline has not been set, however construction is not expected to begin prior to fall 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents